Skip to main content

Concept note and tentative timeline | "Inter-sectoral cooperation on cross-cutting issues: Integrated EE and RE in distributed power systems" (17 Sep 2024, 10h00-11h30, Palais des Nations, Room XXI)

Languages and translations
English
File type1

Concept note and tentative timeline of the joint session "Inter-sectoral cooperation on cross-cutting issues: "Inter-sectoral cooperation on cross-cutting issues: Integrated EE and RE in distributed power systems" (17 Sep 2024, 10h00-11h30, Palais des Nations, Room XXI), in the framework of the eleventh session of the Group of Experts on Energy Efficiency (agenda item 8), the twentieth session of the Group of Experts on Cleaner Electricity Systems (agenda item 7), and the eleventh session of the Group of Experts on Renewable Energy (agenda item 7).