EXCOM approval |
Planning phase |
Implementation phase |
Final Reporting |
|
---|---|---|---|---|
|
Monitoring the Implementation |
Final/Terminal report |
Evaluation ToR Evaluation report |
Midpoint/Annual Progress Reports | Annual funds utilization reports |
---|---|
Annual funds utilization report |
Part I. Planning |
Part II. Implementation |
|||
---|---|---|---|---|
Expected accomplishments |
Planned activities |
Estimated costs (US$) |
Implemented activities3 |
Actual expenditures4 (US$)3 |
E.A.1 Strengthened framework for bilateral cooperation on hydrology and environment. |
A1.1 Annual bilateral meetings 2014-2016 |
75,000 |
||
A1.2 Cooperation Atlas: Translation and broad dissemination of the publication in local languages. |
25,000 |
|||
E.A.2 Improved substantive bilateral cooperation on hydrology, including on the exchange of data. |
A.2.1 Capacity building and development of hydrology data exchange, joint forecasts and flood warnings mechanism |
25,000 |
During the annual meeting the two following documents were endorsed: a “Memorandum of Understanding on exchange of hydrological data and information relating to the Panj-Amu Darya river basin between the state authorities of the Islamic Republic of Afghanistan and the Republic of Tajikistan for the period of 2015-2017 and prospectively until 2020” and “Terms of Reference of the Technical Working Group on hydrological monitoring”. |
|
E.A.3 - Improved substantive bilateral cooperation on environment. |
A.3.1 Capacity building and development of joint environmental monitoring, indicators and data sharing |
15,000 |
The fifth bilateral meeting on hydrology and environment cooperation between Afghanistan and Tajikistan, 22-23 October 2015, Dushanbe, Tajikistan | |
A.3.2 Exchange of experience in operating protected areas and afforestation |
10,000 |
|||
Total (including 13% of Programme Support Costs): |
150,000 |
|
1 The secretariat shall inform EXCOM in case of unexpected developments or serious problems of any kind in the project implementation.
2 Questions from member States on project implementation will be forwarded to the secretariat.
3 Relevant information should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity and include the following:
(a) For an advisory service (including at a workshop/seminar/training organized by other organizations): title; venue; dates; project expenditures; and hyperlink(s) to presentation(s) and other relevant documents;
(b) For a workshop/conference/training organized by UNECE: title; venue; dates; project expenditures; and hyperlinks to the meeting agenda, list of participants, presentation(s) made by UNECE, conference documents, training materials and reports;
(c) For a consultancy: project expenditures; hyperlinks to the consultancy ToR and main outputs (study, report, training material, presentation, etc.) produced by the consultant/s;
(d) For other outputs not included under bullet points above: hyperlink to relevant documents.
[1] Relevant financial information – certified by the Executive Office - should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity.