Skip to main content

Publications

Displaying Results 1 - 18 of 18

The rapid development of high-speed rail (HSR) networks has been observed worldwide in recent years. The experience of states operating these systems demonstrates that they are setting new standards of quality and contributing to the renaissance of railway as a mode of transport. The development of an HSR network in the TER region would significantly improve the competitiveness of rail,
The construction and maintenance of road infrastructure is an important area of most countries’ national economies, but also one of the least digitized sub-sectors. It suffers from the presence of systemic shortcomings including an insufficient level of cooperation, inadequate information management, and limited investment in technology, research and development. These shortcomings often result
The Trans-European North-South Motorway (TEM) Project was initiated to facilitate road traffic in Central, Eastern and South-Eastern Europe and to assist with the process of integrating European transport infrastructure systems. One of the objectives of the Project is to improve the road network’s management. This report aims to provide TEM member countries with up-to-date information about how
The Trans-European North-South Motorway (TEM) Project was initiated to facilitate road traffic in Central, Eastern and South-Eastern Europe and to assist with the process of integrating European transport infrastructure systems. In order to improve the road network’s management, the Project provides TEM member countries with benchmarking of the current capacities of asset management, with up-to-
The United Nations Economic Commission for Europe has a long history of support for developing transport connections between Europe and Asia.  The EATL project, Phase I (2002–2007), Phase II (2008–2012) and Phase III (2013–2017) made transport between Europe and Asia a reality.  Phase III gathered 38 countries from Europe and Asia and concluded that road and rail transportation along Euro-
Brochure on Trans-European Motorways (TEM) ProjectThis brochure gives an overview of the TEM project, its objectives, organization and how to join it.
Road Safety Audit (RSA) and Road Safety Inspection (RSI) are road infrastructure safety management measures which are considered as important engineering tools for improving infrastructure safety. Road safety is frequently discussed at the TEM Steering Committee, which commissioned Road Safety Audit and Road Safety Inspection on the TEM Network report.The report
TEM Project Strategic Plan 2017 – 2021 is a roadmap for the implementation of the TEM Project for 2017 – 2021.The Strategic Plan 2017 – 2021 value proposition:The TEM Project aims to support UNECE and the Inland Transport Committee in pursuing the Sustainable Development Goals related to road infrastructure management;TEM Project will interpret and translate the Sustainable Development Goals
Phase 1 of the Highspeed Masterplan for the TER region has now been completed. The study is available here and covers the following areas:- An introduction to, and history of, High Speed Railways- A review of the benefit, political background, best practice and status of high-speed- Review of related work,
European Agreement concerning the Work of Crews of Vehicles Engaged in International Road Transport (AETR)Road Map for Accession and ImplementationErratum: on page 25, the Russian Federation is erroneously listed as one of the countries applying the AETR Agreement domestically.  The authors regret this error.
The EATL Phase II Report is available in English and Russian.
Content The first section describes the TIR transit system, its coverage, objective and functioning and analyses possible future developments. The second section contains the complete text of the TIR Convention. The third section contains related resolutions and recommendations.  
The TEM and TER revised Master Plan Final report consists of two Volumes - Volume l, containing the main text and Volume II – Annexes.Volume I: Main textVolume II: AnnexesVolume I, is being
The EATL Phase I Report is available in English and Russian.
Integrated Report on Comparison of the TEM and TER Master Plan Backbone Networks and on Implementation of the Priority projects in 2006 Report (pdf 42 KB) Attachment A (pdf 3,970 KB)
In September 2005, the TEM and TER Projects completed the elaboration of their Master Plan, including the identification of the backbone networks for road and rail transport in 21 Central, Eastern and South-Eastern European countries as well as a realistic investment strategy to gradually develop these networks. As a result of this exercise, as many as 491 projects (319 TEM and 172 TER)
The UNECE-sponsored Trans-European North-South Motorway (TEM) Project has published the 3rd Edition of its Standards and Recommended Practice to reflect the up-to-date requirements of motorway users, the latest experience, research and development achievements in the field of motorway design, construction and operation as well as newly required safety measures in motorway tunnels.These