United Nations Directories for Electronic Data Interchange for
Administration, Commerce and Transport
UN/EDIFACT
|
Change indicators
a plus sign (+) for an addition
an asterisk (*) for an amendment to structure
a hash sign (#) for changes to names
a vertical bar (|) for changes to text for descriptions and
notes
a minus sign (-) for marked for deletion (within either
batch and interactive messages)
a X sign (X) for marked for deletion (within both batch
and interactive messages)
4017 Delivery plan commitment level code [B]
Desc: Code specifying the level of commitment to a delivery
plan.
Repr: an..3
Code Values:
1 Firm
Indicates that the scheduling information is a firm
commitment.
2 Commitment for manufacturing and material
Authorizes the supplier to start the manufacturing of
goods.
3 Commitment for material
Authorizes the manufacturer to order material required
for manufacturing specified goods.
4 Planning/forecast
An estimate of future requirements based on trends and
actual information.
5 Short delivered on previous delivery
Part of a consignment which was not delivered when the
original delivery was made.
6 Capacity available
Capacity is available to meet the requested scheduling
demands.
7 Promotion
All related schedule information refer to a promotion.
8 Special demand
All related schedule information refers to a special
demand.
9 User defined
The user can interpret the meaning of the values from
information exchanged previously.
10 Immediate
Indicates that the scheduling information is for
immediate execution.
11 Pilot/Pre-volume
Initial products required in advance of the normal
production process.
12 Planning
An estimate of future requirements.
13 Potential order increase
The possibility and magnitude of a schedule fluctuation.
14 Average plant usage
The usual amount that a manufacturing facility will use
over a specified duration.
15 First time reported firm
Initial confirmation of a material requirement.
16 Maximum
The highest attainable amount.
17 Tooling capacity
The maximum amount that the process was designed to
accommodate.
18 Normal tooling capacity
The anticipated amount that the process was designed to
accommodate over a specific period of time.
19 Prototype
The preliminary version of a product or service.
20 Strike protection
Product level that is set aside as protection in the
event of a work stoppage.
21 Required tooling capacity
The contracted amount that the process was designed to
accommodate over a specific period of time.
22 Deliver to schedule
Deliver to schedule separately supplied.
23 Await manual pull
Await non-EDI instruction before shipping.
24 Reference to commercial agreement between partners
The buyer's commitment is the one defined in the
commercial agreement.
26 Proposed
Indicates that the scheduling information is a proposal.
Data Element Cross Reference
DataElement 4017 is used in the following Batch Segments:
SCC
Copyright United Nations, all rights reserved
UN Economic Commission for Europe
Palais des Nations, CH-1211 Geneva 10, Switzerland
Tel: +41-22 917 2773 Fax: +41-22 917 0037 E-mail: [email protected]
UN/EDIFACT Directories