United Nations Directories
for Electronic Data Interchange for
Administration, Commerce and Transport



 UN/EDIFACT

Change indicators a plus sign (+) for an addition an asterisk (*) for an amendment to structure a hash sign (#) for changes to names a vertical bar (|) for changes to text for descriptions and notes a minus sign (-) for marked for deletion (within either batch and interactive messages) a X sign (X) for marked for deletion (within both batch and interactive messages)

2005 Date or time or period function code qualifier [C]

Desc: Code qualifying the function of a date, time or period. Repr: an..3 Code Values: 1 Service completion date/time, actual Actual date/time on which the service was completed. | 2 Delivery date/time, requested (2105) Date on which buyer requests goods to be delivered. 3 Invoice document issue date time [2377] Date of issue of an invoice. 4 Order document issue date time [2011] Date of order. 5 Saleable stock demand cover period, expected A period of time when saleable stocks are expected to cover demand for a product. 6 Moved from location date The date an entity moved from a location. 7 Effective from date/time (2069) Date and/or time at which specified event or document becomes effective. 8 Order received date/time Date/time when the purchase order is received by the seller. 9 Processing date/time Date/time of processing. 10 Shipment date/time, requested Date on which goods should be shipped or despatched by the supplier. | 11 Despatch date and or time [2171] Date/time on which the goods are or are expected to be despatched or shipped. 12 Terms discount due date/time Date by which payment should be made if discount terms are to apply. 13 Terms net due date Date by which payment must be made. 14 Payment date/time, deferred Date/time when instalments are due. 15 Promotion start date/time Date/time when promotion activities begin. 16 Promotion end date/time Date/time when promotion activities end. | 17 Delivery date/time, estimated (2109) Date and/or time when the shipper of the goods expects delivery will take place. 18 Installation date/time/period The date/time/period of the act, or an instance of installing something or someone. 19 Meat ageing period Period of time between slaughter and delivery during which meat is ageing. 20 Cheque date/time Date/time when cheque is issued. 21 Charge back date/time The date/time of the charge back. 22 Freight bill date/time Date/time when freight bill is issued. 23 Equipment reconditioning date/time, actual Actual date/time of the reconditioning of a piece of equipment. 24 Transfer note acceptance date and time Date and time when a transfer note (transfer document for transport exclusively using containers as equipment) is recognised as being valid by the carrier. 35 Delivery date/time, actual Date/time on which goods or consignment are delivered at their destination. 36 Expiry date Date of expiry of the validity of a referenced document, price information or any other referenced data element with a limited validity period. 37 Ship not before date/time Goods should not be shipped before given date/time. 38 Ship not later than date/time Date/time by which the goods should have been shipped. 39 Ship week of date Date identifying the week during which goods should be shipped. 40 Clinical information issue date and/or time Date and/or time when clinical information is issued. 41 Event duration, expected The expected duration of an event. 42 Superseded date/time Date/time being overlaid by a date given elsewhere. 43 Event duration, intended The intended duration of an event. 44 Availability Date/time when received item is available. 45 Compilation date and time Date and time of the compilation. | 46 Cancellation date [2095] Date on which a document or message has been cancelled. 47 Statistical time series date Date for statistical time series purposes. 48 Duration Duration. 49 Deliver not before and not after dates Deliver not before and not after a specific date range. 50 Goods receipt date/time Date/time upon which the goods were received by a given party. 51 Cumulative quantity start date First Date for accumulation of delivery quantities. 52 Cumulative quantity end date Last Date for accumulation of delivery quantities. 53 Buyer's local time Time at the buyer's location. 54 Seller's local time Time at the seller's location. 55 Confirmed date/time Date/time which has been confirmed. 56 Original authorisation date and/or time Date and/or time when original authorisation was issued. 57 Precaution relevant period The period when a precaution is relevant. 58 Clearance date (Customs) Date on which Customs formalities necessary to allow goods to be exported, to enter home use, or to be placed under another Customs procedure has been accomplished (CCC). 59 Inbound movement authorization date Inland movement authorization date. 60 Engineering change level date Date the engineering level of goods is changed. 61 Cancel if not delivered by this date The date on which cancellation should take place, if delivery has not occurred. 62 Excluded date Date excluded from a period of time. 63 Delivery date time, last [2025] Last date, and optionally time of a delivery. | 64 Delivery date/time, earliest [2091] Date identifying a point in time before which the goods shall not be delivered. 65 Delivery date/time, 1st schedule The first scheduled date/time for delivery. 66 Excluded period An interval of time excluded from a period of time. 67 Delivery date/time, current schedule Delivery Date deriving from actual schedule. 68 Additional period An interval of time added to a period of time. 69 Delivery date time, promised before [2139] Date and optionally time by which the merchandise should be delivered to the buyer, as agreed between the seller and the buyer (generic term). 70 Additional date Date added to a period of time. 71 Delivery date/time, requested for (after and including) Delivery is requested to happen after or on given date. 72 Delivery date/time, promised for (after and including) Delivery might take place earliest at given date. 73 Guarantee period The period for which the guarantee is or will be granted. 74 Delivery date/time, requested for (prior to and including) Delivery is requested to happen prior to or including the given date. 75 Delivery date/time, promised for (prior to and including) Delivery might take place latest at given date. 76 Delivery date/time, scheduled for The date/time for which delivery is scheduled. 77 Specification revision date Date of revision to a specification. | 78 Event date/time/period, actual [2193] The actual date/time/period an event occurred. 79 Shipment date/time, promised for Shipment might happen at given date/time. 80 Planning end date and/or time, actual The actual date and/or time the planning ended. 81 Shipment date/time, requested for (after and including) Shipment should happen earliest at given date. 82 Medicine administration time Designated time of day for the administration of medicine. 83 Dispensing interval, minimum The shortest interval allowed between one dispensing of an item and the next dispensing of the same item. 84 Shipment date/time, requested for (prior to and including) Shipment should take place latest at given date. 85 Shipment date/time, promised for (prior to and including) Shipment might take place latest at given date. 86 Medication date/time, start Date and/or time when medication was started. 87 Travel service connection time Time elapsing between the arrival of a travel service and the departure of a connecting travel service. 88 Summer time, start Date/time at which the summer time starts. 89 Inquiry date The date on which an inquiry is made. 90 Report start date The date on which a report is to begin. 91 Report end date The date on which a report is to end. 92 Contract effective date Date when a contract becomes valid. 93 Contract expiry date Date when a contract expires. 94 Production/manufacture date Date on which goods are produced. 95 Bill of lading date Date as specified on the bill of lading. 96 Discharge date/time Date/time when goods should, might or have been discharged from the means of transport. 97 Transaction creation date The date on which a transaction was originated or brought into being. 98 Winter time, start Date/time at which the winter time starts. 99 Quotation opening date The date on which the quotation has been or may be opened. 100 Product ageing period before delivery Period of time before delivery during which the product is ageing. 101 Production date, no schedule established as of Date as of there is no valid production schedule. 102 Health problem period Period of time of health problem. 103 Closing date/time for breakbulk STORO Date/time on which delivering period for breakbulk STORO cargo ends (STORO = Stowing on Roll on-Roll off vessel). 104 Closing date/time for container RO-RO Date/time on which delivering period for container Roll on-Roll off (RO-RO) cargo ends. 105 Starting date/time for breakbulk STORO Date/time on which delivering period for breakbulk STORO cargo starts (STORO = Stowing on Roll on-Roll off vessel). 106 Starting date/time for container RO-RO Date/time on which delivering period for container Roll on-Roll off (RO-RO) cargo starts. 107 Deposit date/time The date/time on which a deposit was made. 108 Postmark date/time An official mark stamped on a letter identifying date/time of dispatch or arrival. 109 Receive at lockbox date The date on which a financial institution, serving as collection agency for a company located in another part of the country, collects an amount of money on behalf of that company. 110 Ship date, originally scheduled The date on which the shipment of goods was originally scheduled. 111 Manifest/ship notice date The date of issuance of a manifest or ship notice. 112 First interest-bearing date The first date from which interest is borne. 113 Sample required date Date as of a sample has to be available customer defined. 114 Tooling required date Date as of a tool has to be available customer defined. 115 Sample available date Date as of a sample will be available seller defined. 116 Equipment return period, expected Period until which equipment is expected to be hired. 117 Delivery date/time, first First possible date/time for delivery. 118 Cargo booking confirmed date/time Date/time at which the cargo booking has been accepted by the carrier. 119 Test completion date Date when a test has been completed. 120 Last interest-bearing date The last date from which interest is borne. 121 Entry date Date of entry. 122 Contract completion date The date a contract is completed. 123 Documentary credit expiry date/time (2211) The latest date/time for presentation of the documents to the bank where the credit expires. 124 Despatch note document issue date time [2219] Issue date of a despatch note. 125 Import permit issue date time [2293] Date of issue of an import licence. 126 Contract document issue date time [2327] Date on which a contract is issued. 127 Previous report date Date of the previous report. 128 Delivery date/time, last Date when the last delivery should be or has been accomplished. 129 Exportation date [2043] Date when the imported vessel/merchandise last left the country of export for the country of import. 130 Current report date Date of the current report. 131 Tax point date time [2221] Date on which tax is due or calculated. 132 Transport means arrival date time, estimated [2349] Date and or time of the estimated arrival of means of transport. | 133 Transport means departure date/time, estimated (2195) Date/time when carrier estimates that a means of transport should depart at the place of departure. 134 Rate of exchange date/time Date/time on which the exchange rate was fixed. 135 Telex date Date identifying when a telex message was sent. 136 Transport means departure date time, actual [2281] Date and or time of the departure of a means of transport. 137 Document issue date time [2007] Date that a document was issued and when appropriate, signed or otherwise authenticated. 138 Payment availability date time [2035] Date that an amount due becomes available to a creditor under the terms of payment. 139 Property mortgage date, start The date the mortgage on a piece of property begins. | 140 Payment due date [2481] Date/time at which funds should be made available. 141 Customs declaration document lodgement date time [2033] Presentation date of a declaration to customs. 142 Labour wage determination date The date a labour wage is determined. 143 Consignment acceptance date time, actual [2127] Actual date and optionally time when a consignment of goods is taken over by the carrier at the place of acceptance. 144 Quota date Date that the quota applies to. 145 Event date A date specifying an event. 146 Entry date, estimated (Customs) Date on which the official date of Customs entry is anticipated. 147 Export permit effective end date time [2079] Date on which an export licence expires. 148 Goods declaration document acceptance date time [2037] Date on which a Goods declaration has been or will be accepted by Customs in accordance with Customs legislation. 149 Invoice date, required Date required for invoice issue. 150 Declaration/presentation date Date when item has been or has to be declared/presented. 151 Importation date Date on which goods are imported, as determined by the governing Customs administration. 152 Exportation date for textiles Date when imported textiles last left the country of origin for the country of importation. 153 Cancellation date/time, latest The latest date/time on which cancellation of the payment order may be requested. | 154 Acceptance date of document [2097] The date on which a document was accepted. 155 Accounting period start date The first date of an accounting period. 156 Accounting period end date The last date of an accounting period. 157 Validity start date The first date of a period for which something is valid. 158 Horizon start date The first date of a period forming a horizon. 159 Horizon end date The last date of a period forming a horizon. 160 Authorization date Date when an authorization was given. 161 Release date of customer Date the customer authorised the goods' release. 162 Release date of supplier Date when the supplier released goods. 163 Processing start date/time Date/Time when a specific process starts. 164 Processing end date/time Date/Time when a specific process ends. 165 Tax period start date Date when a tax period begins. 166 Tax period end date Date when a tax period ends. 167 Charge period start date The charge period's first date. 168 Charge period end date The charge period's last date. 169 Lead time Time required between order entry till earliest goods delivery. 170 Settlement due date More generic than 'payment due date' and therefore more apt for reinsurance/insurance business. 171 Reference date/time Date/time on which the reference was issued. 172 Hired from date Date from which an item has been or will be hired. 173 Hired until date Date until which an item has been or will be hired. 174 Advise after date/time The information must be advised after the date/time indicated. 175 Advise before date/time The information must be advised before the date/time indicated. 176 Advise completed date/time The advise has been completed at the date indicated. 177 Advise on date/time The information must be advised on the date/time indicated. 178 Transport means arrival date time, actual [2107] Date and or time of the arrival of means of transport. 179 Booking date/time Date at which the booking was made. 180 Closing date/time Final date for delivering cargo to a liner ship. 181 Positioning date/time of equipment Date/time when equipment is positioned. 182 Issue date Date when a document/message has been or will be issued. 183 Date, as at Date related to a given context. 184 Notification date/time Date/time of notification. 185 Commenced tank cleaning date/time The date/and or time tank cleaning was started. 186 Transport means departure date/time, actual (2280) Date (and time) of departure of means of transport. 187 Authentication date/time of document Date/time when the document is signed or otherwise authenticated. 188 Previous current account date Date of the previous current account. 189 Transport means departure date/time, scheduled Date (and time) of scheduled departure of means of transport. 190 Transhipment date/time Date and time of the transfer of the goods from one means of transport to another. 191 Delivery date/time, expected Date/time on which goods are expected to be delivered. 192 Expiration date/time of customs document Date on which validity of a customs document expires. 193 Execution date The date when ordered bank initiated the transaction. 194 Start date/time Date/time on which a period starts. 195 Import permit effective end date time [2273] Date on which the validity of an import licence expires. 196 Transport means departure date/time, earliest Date/time of earliest departure of means of transport. 197 Lay-time first day First of a number of days allowed in a charter party of the loading and discharging of cargo. 198 Lay-time last day Last of a number of days allowed in a charter party for the loading and discharging of cargo. 199 Positioning date/time of goods The date and/or time the goods have to be or have been positioned. 200 Cargo pick-up date / time Date/time at which the cargo is picked up. Synonym: collected. 201 Equipment pick-up date / time Date/time at which the equipment is picked up. 202 Posting date The date when an entry is posted to an account. 203 Execution date/time, requested The date/time on which the ordered bank is requested to initiate the payment order, as specified by the originator (e.g. the date of the debit). | 204 Release date (Customs) (2135) Date on which Customs releases merchandise to the carrier or importer. 205 Settlement date Date for settlement of financial transaction e.g. foreign exchange securities. 206 End date/time Date/time on which a period (from - to) ends. 207 Commenced pumping ballast date/time Date/time on which the intake of materials to be carried to improve the trim and the stability of the means of transport, was commenced. 208 Transport means departure date/time, ultimate Date/time at which a means of transport has to depart ultimately. 209 Value date Date on which the funds are at the disposal of the beneficiary or cease to be at the disposal of the ordering customer. 210 Reinsurance current account period The date of the current reinsurance account. 211 360/30 Calculation is based on year of 360 days, month of 30 days. 212 360/28-31 Calculation is based on year of 360 days, month of 28-31 days. 213 365-6/30 Calculation is based on year of 365-6 days, month of 30 days. 214 365-6/28-31 Calculation is based on year of 365-6 days, month of 28- 31 days. 215 365/28-31 Calculation is based on year of 365 days, month of 28-31 days. 216 365/30 Calculation is based on year of 365 days, month of 30 days. 217 From date of award to latest delivery Lead time to determine the latest date a delivery can be made based on the date an award is made. 218 Authentication/validation date/time The date/time of authentication and/or validation. 219 Crossborder date/time Date/time at which goods are transferred across a country border. 220 Property mortgage scheduled date, end The date the mortgage on a piece of property is scheduled to end. 221 Interest period Number of days used for the calculation of interests. 222 Presentation date, latest Latest date for presentation of a document. 223 Delivery date/time, deferred New date and time of delivery calculated on basis of a consignee's requirement (chargeable). 224 Permit to admit date Date on which permission was granted to move merchandise into a bonded warehouse or free trade zone. 225 Certification of weight date/time Date/time at which the carrier proceeds to the weighting of the goods. 226 Discrepancy date/time Date/time at which a discrepancy has been found. 227 Beneficiary's banks due date Date on which funds should be made available to the beneficiary's bank. 228 Debit value date, requested Date on which the account owner wants the debit value to his account. 229 Hoses connected date/time The date and/or time hoses were connected. 230 Hoses disconnected date/time The date and/or time hoses were disconnected. 231 Transport means arrival date/time, earliest Date/time of earliest arrival of means of transport. 232 Transport means arrival date/time, scheduled Date (and time) of scheduled arrival of means of transport. 233 Transport means arrival date/time, ultimate Date (and time) of ultimate arrival of means of transport. 234 Collection date/time, earliest The transport order may be issued before the goods are ready for picking up. This date/time indicates from when on the carrier can have access to the consignment. 235 Collection date/time, latest In relation with the arrangements agreed between buyer and seller or between sender and main transport it may be necessary to specify the latest collection date/time. 236 Completed pumping ballast date/time Date/time at which the intake of materials, to be carried to improve the trim and the stability of the means of transport, was completed. 237 Completed tank cleaning date/time The date and/or time tank cleaning was completed. 238 Tanks accepted date/time The date and/or time the tanks are to be or have been accepted. 239 Tanks inspected date/time The date and/or time the tanks are to be or have been inspected. 240 Reinsurance accounting period To identify a reinsurance account period via start and end dates. Note: 1. This period is not the same as "reinsurance current account period". 241 From date of award to earliest delivery Lead time to determine the earliest date a delivery can be made based on the date an award is made. 242 Preparation date/time of document Date and/or time that the document was prepared. 243 Transmission date/time of document The date/time at which a document was transmitted. 244 Settlement date, planned The date for which settlement is planned. 245 Underwriting year Year in which the treaty was commenced. 246 Accounting year Year considered for accounting of the treaty or portion of the treaty. 247 Year of occurrence Year in which a specific event (e.g. a loss) took place. 248 Loss Date, time, period on which a referenced loss occurred. 249 Cash call date Date on which a cash call was made for a loss suffered and covered. 250 Re-exportation date Date of re-exportation. 251 Re-importation date Date of re-importation. 252 Arrival date/time at initial port Date/time that the conveyance arrives at the initial port in the country of destination. 253 Departure date/time from last port of call Date/time that conveyance departed from the last foreign port of call. 254 Registration date of previous Customs declaration Registration date of the Customs declaration for the previous Customs procedure either in the same or another country. 255 Availability due date Date when ordered items should be available at a specified location. 256 From date of award to completion Lead time to determine the completion date of an effort based on the date an award is made. 257 Calculation date time [2253] Date on which the calculation was made. 258 Guarantee date Date when a guarantee is placed. | 259 Conveyance registration date [2063] Date when a vessel, vehicle or other means of transport was registered by a competent authority. 260 Valuation date (Customs) Date when Customs valuation was made. 261 Release date/time Date/time assigned to identify the release of a set of rules, conditions, conventions, productions, etc. 262 Closure date/time/period Date/time/period when an enterprise is closed. 263 Invoicing period Period for which an invoice is issued. 264 Release frequency Frequency of a release. 265 Due date The date on which some action should occur. 266 Validation date The date on which something was made valid, ratified or confirmed. 267 Rate/price date/time Date/time on which a rate/price is determined. 268 Transit time/limits The time to go over a distance. 269 Discharge date/time, started Date/time when discharge operations were started. 270 Ship during date The date identifying the period during or in which the goods should be shipped. 271 Ship on or about date Date on or about which goods should be shipped. | 272 Documentary credit presentation period [2060] The specification of the period of time, expressed in number of days, after the date of issuance of the transport document(s) within which the documents must be presented. 273 Validity period Dates (from/to)/period referenced documents are valid. 274 From date of order receipt to sample ready Lead time is the defined timespan. 275 From date of tooling authorization to sample ready Lead time is the defined timespan. 276 From date of receipt of tooling aids to sample ready Lead time is the defined timespan. 277 From date of sample approval to first product shipment Lead time is the defined timespan. 278 From date of order receipt to shipment Lead time is the defined timespan. 279 From date of order receipt to delivery Lead time is the defined timespan. 280 From last booked order to delivery Lead time is the defined timespan. 281 Date of order lead time Lead time is referenced to the date of order. 282 Confirmation date lead time Lead time is referenced to the date of confirmation. 283 Arrival date/time of transport lead time Lead time is referenced to the date a transport will arrive or has arrived. 284 Before inventory is replenished based on stock check lead time Lead time is the defined timespan. 285 Invitation to tender date/time Date/time on which the invitation to tender has been made available to relevant parties. 286 Tender submission date/time Date/time on which the tender was submitted. 287 Contract award date/time Date/time on which the contract is awarded to a tenderer. 288 Price base date/time Base date/time of prices. 289 Interest rate validity period Validity period of the interest rate. 290 Contractual start date/time Date/time on which activities stated in the contract must start. 291 Start date/time, planned The date/time for which something is planned to begin or commence. 292 Works completion date/time, planned The date/time for the completion of building or repair operations is planned. 293 Works completion date/time, actual The actual date/time for the completion of building or repair operations. 294 Hand over date/time, planned Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) is planned to take place. 295 Hand over date/time, actual Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) actually takes place. 296 Retention release date/time Date/time on which the retention is released. 297 Retention release date/time, partial Date/time on which the retention is partially released. 298 Goods pick-up date / time, planned Date/time at which goods can be picked up, according to a plan. 299 Price adjustment start date Value date of the indexes appearing as denominators in a price adjustment formula. 300 Price adjustment limit date Limit value date of indexes used as numerators in a price adjustment formula. 301 Value date of index Date of validity of index values. 302 Publication date The date of the act of making something publicly known. 303 Escalation date Value date of indexes appearing as numerators in an escalation formula. 304 Price adjustment date Value date of indexes appearing as numerators in a price adjustment formula. 305 Latest price adjustment date Date on which the latest price adjustment took place. 306 Work period Period of execution of works. 307 Payment instruction date/time Date/time on which a payment instruction was given. 308 Payment valuation presentation date/time Date/time on which the payment valuation is presented. 309 Banks' value date Date on which the funds are at the disposal of the receiving bank or cease to be at the disposal of the sending bank. 310 Received date/time Date/time of receipt. 311 On Fixed maturity day for deferred payment or time draft(s). 312 Ship not before and not after date/time Shipment(s) of goods is/are to be made not before the first specified date/time and not after the second specified date/time. 313 Order to proceed date Issue date of an instruction to start work. 314 Planned duration of works The period of time planned for the completion of building or repair operations. 315 Agreement to pay date Date on which the debtor agreed to pay. 316 Valuation date/time Date/time of valuation. 317 Reply date The date to answer or to respond in word or action. 318 Request date The date on which something was asked for. 319 Customer value date Date at which funds are taken into account for interest calculation (in debit or credit). 320 Declaration reference period Reference period of a set of items reported on the same declaration. 321 Promotion date/period Date/period relevant for specific promotion activities. 322 Accounting period A period of time for the recording of financial transactions for accounting. 323 Horizon period Period forming a (planning) horizon. 324 Processing date/period Date/period a specific process happened/will happen. 325 Tax period Period a tax rate/tax amount etc. is applicable. 326 Charge period Period a specified charge is valid for. 327 Instalment payment due date Date on which an instalment payment is due. 328 Payroll deduction date/time Date/time of a monetary deduction made from the salary of a person on a payroll. | 329 Person birth date time [2491] (2051) Date on which an individual is or was born. 330 Joined employer date Date when a person joins an employer. 331 Contributions ceasing date/time Date/time when contributions cease. 332 Contribution period end date/time Date/time when a contribution period ends. 333 Part-time working change date/time Date/time when the proportion of part-time work changes. 334 Status change date/time Date/time when a status changes. 335 Contribution period start date/time Date/time when a contribution period commences. 336 Salary change effective date Date when a change in salary becomes effective. 337 Left employer date Date when a person leaves an employer. 338 Benefit change date/time Date/time when a benefit provided by a service provider is changed. 339 Category change date/time Date/time when a change of category is made. 340 Joined fund date/time Date/time when a person joins a fund. 341 Waiting time The period of time between the moment at which one wants an activity to begin and the moment at which this activity can actually begin. 342 Consignment loading date time [2347] Date and optionally time when a consignment is to be or has been loaded onto a means of transport. 343 Date/time of discount termination Date/time when the deduction from an amount comes to an end. 344 Date/time of interest due Date/time when the interest has to be paid. 345 Days of operation Week days of operation. 346 Latest check-in time Latest time of check-in. 347 Slaughtering start date Date on which slaughtering commenced. 348 Packing start date Date on which packing commenced. 349 Packing end date Date on which packing completed. 350 Test start date Date when a test has been started. 351 Inspection date Date of inspection. 352 Slaughtering end date Date on which slaughtering completed. 353 Accounting transaction date Date to which an accounting transaction refers. 354 Activity period date range A specific date range associated with an activity. 355 Contractual delivery date The date of delivery contractually agreed between parties. 356 Sales date, and or time, and or period The date, and or time, and or period on which a sale took place. 357 Cancel if not published by this date Cancel if not published by this date. 358 Scheduled for delivery on or after Scheduled for delivery on or after the specified date, and or time. 359 Scheduled for delivery on or before Scheduled for delivery on or before specified date and or time. 360 Sell by date The date by which a product should be sold. 361 Product best before date time [2497] Indication that freshness of goods is limited in time to the date shown. 362 End availability date The end date of availability. 363 Total shelf life period A period indicating the total shelf life of a product. 364 Minimum shelf life remaining at time of despatch period Period indicating the minimum shelf life remaining for a product at the time of leaving the supplier. 365 Packaging date The date on which the packaging of a product took place. 366 Inventory report date Date on which a inventory report is made. 367 Meter reading date, previous Date on which the previous reading of a meter took place. 368 Meter reading date, latest Date on which the latest reading of a meter took place. 369 Date and or time of handling, estimated The date and or time when the handling action is estimated to take place. 370 Date when container equipment becomes domestic The date on which foreign-built container equipment has entered into the commerce of another country and has become domestic equipment. 371 Hydrotest date The date equipment has been hydrotested. 372 Equipment pre-trip date The date on which equipment is pre-tripped. 373 Mooring, date and time Date and time of mooring. 374 Road fund tax expiry date The date of expiry of the road fund tax. 375 Date of first registration Date of first registration. 376 Biannual terminal inspection date The date on which a biannual inspection of a terminal has taken or will take place. 377 Federal HighWay Administration (FHWA) inspection date The date on which container equipment is to be or has been inspected in accordance with the requirements of the U.S. Federal Highway Administration. 378 Container Safety Convention (CSC) inspection date The date on which container equipment is to be or has been inspected as per the Container Safety Convention (CSC). 379 Periodic inspection date The date on which a periodic inspection has to take place. 380 Drawing revision date Date the drawing revision has been allocated to a design. 381 Product lifespan at time of production The total lifespan of a product at the time of its production. 382 Earliest sale date The earliest date on which the product may be made available for sale. 383 Cancel if not shipped by this date Cancel the order if goods not shipped by this date. 384 Previous invoice date Indicates the date which was allocated to a previous invoice. 385 Payment cancelled, violation of agreement Date/time when a payment is cancelled due to the fact that the transaction does not comply with the agreement. 386 Payment cancelled due to administrative error Date/time when a payment is cancelled due to an administrative error. 387 Repair turnaround time Provides the period of time necessary to turnaround a given repair. 388 Order amendment binding date The date when an order amendment becomes binding for both parties. 389 Cure time Specifies the length of time that an article was or should be cured. 390 From date of award to delivery Lead time to determine the delivery date based on the date an award is made. 391 From date of receipt of item to approval Lead time to determine the date an item will be approved based on the date the item was received. | 392 Equipment pick-up date / time, earliest [2125] Earliest date/time at which the equipment can be picked up. 393 Equipment pick-up date / time, planned Date/time at which equipment can be picked up, either full or empty, according to a plan. 394 Equipment positioning date/time, actual Date/time on which equipment was actually positioned (delivered). 395 Equipment positioning date/time, estimated Date/time on which equipment is estimated to be positioned (delivered). 396 Equipment positioning date/time, requested Date/time on which equipment is requested to be positioned (delivered). 397 Equipment positioning date/time, ultimate Date/time on which equipment should be positioned (delivered) at the latest. 398 Goods collection or pick-up date/time, planned Date/time at which goods can be picked up, according to a planning. 399 Goods positioning date/time, expected Date/time on which goods are expected to be positioned. 400 Cargo release date/time, ultimate Ultimate date/time at which goods or equipment should be released. 401 Container Safety Convention (CSC) plate expiration date Date on which the validity of a Container Safety Convention (CSC) plate expires. 402 Document received date/time Date/time on which the document was actually received. 403 Discharge date/time, actual Date/time when the specified goods or transport equipment has or have been discharged from the means of transport. 404 Transport means loading date/time, actual Date/time when the specified goods or transport equipment has or have been loaded in or on the means of transport. | 405 Equipment pick-up date / time, actual [2123] Date/time on which the equipment was actually collected. 406 Goods positioning date/time, planned The date/time on which the goods will be positioned according to a planning. 407 Document requested date/time Date/time on which the document is requested by a party. 408 Expected container hire from date/time Estimated date and time when the containers are expected to go on-hire. 409 Order completion date/time, ultimate Date/time on which the order should be completed at the latest. 410 Equipment repair ready date/time, ultimate Ultimate date/time on which a piece of equipment must be repaired. 411 Container stuffing date/time, ultimate Date/time on which the container stuffing should be completed at the latest. 412 Container stripping date/time, ultimate Date/time on which the container stripping should be completed at the latest. 413 Discharge and loading completed date/time Date/time when all discharge and loading operations on the transport means have been completed. 414 Equipment stock check date/time Date/time on which equipment has been ascertained as being in stock. 415 Activity reporting date The date applicable to the activity being reported. 416 Submission date The date of a submission. 417 Previous booking date/time Date/time at which the previous booking was made. 418 Minimum shelf life remaining at time of receipt The minimum shelf life remaining at the time of receipt. 419 Forecast period A period for which a forecast applies. 420 Unloaded, date and time To report the date and time that an unloading action occurred. 421 Estimated acceptance date To estimate the date of acceptance. 422 Documentary credit issue date The date the documentary credit has been issued. 423 First date of ordering The first date on which ordering may take place. 424 Last date of ordering The last date on which ordering may take place. 425 Original posting date Date when the entry was originally posted. 426 Reinsurance payment frequency The frequency of payments of reinsurance premiums. 427 Adjusted age The adjusted age used for purposes of calculation. 428 Original issue age The original issue age. 429 Coverage duration The period coverage has been in force. 430 Coverage issue date Date from which the anniversary coverage is measured. 431 Flat extra period Period for charging the additional extra. 432 Paid to date Date to which payments have been paid. 433 Reinsurance coverage duration The period for which reinsurance coverage has been in force. 434 Maturity date Date at which maturity occurs. 435 Reinsurance issue age The actual or equivalent age at time of issue. 436 Reinsurance paid-up date The date up to which the reinsurance has been paid. 437 Benefit period The period of time for which benefits are provided. 438 Disability wait period The period of time the insured must be disabled before reinsurance coverage becomes effective. 439 Deferred Period The period of time for which an activity has been postponed. 440 Documentary credit amendment date Date of amendment of a documentary credit. 441 Last on hire date Date the item was last placed on hire. 442 Last off hire date Date the item was last returned from hire. 443 Direct interchange date Date the item was directly interchanged. 444 Approval date Date of approval. 445 Original estimate date The date of the original estimate. 446 Revised estimate date The date the estimate was revised. 447 Creditor's requested value date Date on which the creditor requests to be credited. 448 Referenced item creation date Creation date of referenced item. 449 Date for the last update Date for the last update. 450 Opening date Date of opening. 451 Source document capture date Date source document data is entered into a business application. 452 Trial balance period Period covered by the trial balance. 453 Date of source document The date of the source document. 454 Accounting value date Date against which the entry has to be legally allocated. 455 Expected value date Date on which the funds are expected to be at the disposal of the beneficiary. 456 Chart of account period Period covered by the chart of account. 457 Date of separation Date of marital separation. 458 Date of divorce Date when two married persons are officially divorced. 459 Date of marriage Date when two persons are married. 460 Wage period, start date Date when a period of wage begins. 461 Wage period, end date Date when a period of wage ends. 462 Working period, start date Date when a period of work begins. 463 Working period, end date Date when a period of work ends. 464 Embarkation date and time Date and time at which crew and/or passengers board. 465 Disembarkation date and time Date and time at which crew and/or passengers disembark. 466 Time now date A time now date used for planning and scheduling purposes. 467 Holiday A date or period that is a break from work. 468 Non working To specify a non working date or period. 469 Start date or time, earliest The earliest date or time for starting. 470 Start date or time, latest The latest date or time for starting. 471 Finish date or time, earliest The earliest date or time for finishing. 472 Finish date or time, latest The latest date or time for finishing. 473 Start date or time, mandatory The mandatory date or time for starting. 474 Finish date or time, mandatory The mandatory date or time for finishing. 475 Start date or time, actual The actual date or time for starting. 476 Start date or time, estimated The estimated date or time for starting. 477 Completion date or time, estimated The estimated date or time for completion. 478 Start date or time, scheduled The scheduled date or time for starting. 479 Completion date or time, scheduled The scheduled date or time for completion. 480 Start date or time, not before The not before date or time for starting. 481 Start date or time, not after The not after date or time for starting. 482 Completion date or time, not before The not before date or time for completion. 483 Completion date or time, not after The not after date or time for completion. 484 Illness recovery date, expected Date when a person is expected to recover from illness. 485 Period of illness, start date Date when a period of illness began. 486 Period of illness, end date Date when a period of illness ends. 487 Decease date Date when a person died. 488 Benefit period, start date Date when a period of benefit begins. 489 Benefit period, end date Date when a period of benefit ends. 490 Selection period, start date Date when a period of selection begins. 491 Selection period, end date Date when a period of selection ends. 492 Balance date/time/period The date/time/period of a balance. 493 Benefit payments termination date To identify the date on which benefit payments have ceased. 494 Covered income period To identify the period over which covered income is measured. 495 Current income period To identify the period over which current income is measured. 496 Reinstatement date Identifies the date of reinstatement. 497 Definition of disability duration To identify the period for which the definition of disability applies. 498 Previous termination date Identifies the date of the previous termination. 499 Premium change period To identify the period of the premium change. 500 Off-hire survey date Date on which the equipment was surveyed at the end of the current leasing period. 501 In service survey date Date of survey of equipment while in use. 502 On hire survey date Date on which the equipment was surveyed at the beginning of the current leasing period. 503 Production inspection date Date of production inspection. 504 Overtime, start date Date when a period of overtime begins. 505 Overtime, end date Date when a period of overtime ends. 506 Back order delivery date/time/period The date/time/period during which the delivery of a back order will take, or has taken, place. 507 Negotiations start date The date on which negotiations started. 508 Work effective start date The date on which work will effectively start. 510 Notification time limit The time limit which has been set for a notification to take place. 511 Time limit The time limit in which an event must take place. 512 Attendance date and or time and or period Date and or time and or period of attendance. 513 Accident date and or time Date and or time when an accident occurred. 514 Adoption date, actual Actual date when adoption occurs. 515 Reimbursement claim issue date and or time Date and or time when a reimbursement claim is issued. 516 Hospital admission date and or time Date and or time of admission to a hospital. 517 Hospital discharge date and or time Date and or time of discharge from a hospital. 518 Period of care start date and or time Date and or time when a period of care starts. 519 Period of care end date and or time Date and or time when a period of care ends. 520 Department admission date and or time Date and or time of admission to a department. 521 Department discharge date and or time Date and or time of discharge from a department. 522 Childbirth date and or time, actual Actual date and or time of childbirth. 523 Prescription issue date and or time Date and or time when a prescription was issued. 524 Prescription dispensing date and or time Date and or time when a prescription was dispensed. 525 Clinical examination date and or time Date and or time of clinical examination. 526 Death date and or time Date and or time of death. 527 Childbirth date, estimated Estimated date of childbirth. 528 Last menstrual cycle, start date Date when the last menstrual cycle started. 529 Pregnancy duration, actual Actual duration of pregnancy. 530 Fumigation date and/or time The date/or time on which fumigation is to occur or has taken place. 531 Payment period A period of time in which a payment has been or will be made. 532 Average delivery delay The average delay between deliveries. 533 Budget line application date The date on which something has been applied to a budget line. 534 Date of repair or service The date of a repair or service. 535 Date of product failure The date the product failed. 536 Review date Date the item was or will be reviewed. 537 International review cycle start date Date the international review cycle starts. 538 International assessment approval for publication date Date the Data Maintenance Request (DMR) was approved for publication after completing international review. 539 Status assignment date Date a status was assigned. 540 Instruction's original execution date Original execution date for the instruction. 541 First published date Date when material was first published. 542 Last published date Date when material was last published. 543 Balance sheet date, latest Date of the latest balance sheet. 544 Security share price as of given date Date of the security share price. 545 Assigned date Date when assigned. 546 Business opened date Date opened for business. 547 Initial financial accounts filed date Date when the initial financial accounts were filed. 548 Stop work as of given date Date work stopped or will stop. 549 Completion date Date of completion. 550 Lease term, start date Start date of the lease term. 551 Lease term, end date End date of the lease term. 552 Start date, actual Actual date of start. 553 Start date, estimated Date of estimated start. 554 Filed date Date when filed. 555 Return to work date Date of return to work. 556 Purchased date Date of purchase. 557 Returned date Date return takes place. 558 Changed date Date change takes place. 559 Terminated date Date termination takes place. 560 Evaluation date Date evaluation takes place. 561 Business termination date Date the business terminates. 562 Release from bankruptcy date Date when an entity is released from bankruptcy status. 563 Placement date, initial Date of initial placement. 564 Signature date Date of signature. 565 Bankruptcy filed date Date when bankruptcy was filed. 566 End date, scheduled Date when activity is scheduled to end. 567 Report period Period covered by the report. 568 Suspended date Date of suspension. 569 Renewal date Date of renewal. 570 Reported date Date when reported. 571 Checked date Date when checked. 572 Present residence, start date The beginning date of residence at present location. 573 Employment position, start date The start date of employment in a particular position. 574 Account closed date Date when account was closed. 575 Construction date, actual Date of actual construction. 576 Employment profession start date Start date of employment in a particular profession. 577 Next review date Date of next review. 578 Meeting date Date of the meeting. 579 Administrator ordered date Date when an administrator is ordered for a company. 580 Last date to file a claim Date after which no claim can be filed. 581 Convicted date Date when convicted. 582 Interviewed date Date of an interview. 583 Last visit date Date of last visit. 584 Future period Period in the future. 585 Preceding period Period preceding current period. 586 Expected problem resolution date Date when problem is expected to be resolved. 587 Action date Date of action. 588 Accountant's opinion date Date of an accountant's opinion. 589 Last activity date Date of last activity. 590 Resolved date Date when resolved. 591 Recorded date Date when recorded. 592 Date of birth, estimated The estimated date of birth. 593 Last annual report date Date of the last annual report. 594 Net worth date Date of net worth. 595 Payment cancellation rejected Date/time when a cancellation of a payment is rejected due to the fact that the payment is already done. 596 Profit period Period over which profit was earned. 597 Registration date Date when registered. 598 Consolidation date Date when consolidation occurred. 599 Board of directors not authorised as of given date As of this date the board of directors is not authorised. 600 Board of directors not complete as of given date As of this date the board of directors is not fully filled. 601 Manager not registered as of given date As of this date the manager is not registered. 602 Citizenship change date Date of citizenship change. 603 Participation date Date of participation. 604 Capitalisation date Date of capitalisation. 605 Board of directors registration date Date when the board of directors was registered. 606 Operations ceased date Date when operations ceased. 607 Satisfaction date Date when satisfaction was obtained. 608 Legal settlement terms met date Date when terms specified in the legal settlement were met. 609 Business control change date Date when a new authority took control. 610 Court registration date Date of registration in the court. 611 Annual report due date Date when annual report is due. 612 Asset and liability schedule date Date of the asset and liability schedule. 613 Annual report mailing date Date when the annual report was mailed. 614 Annual report filing date Date when the annual report was filed. 615 Annual report delinquent on date Date when annual report was considered delinquent. 616 Accounting methodology change date Date when accounting methodology was changed. 617 Closed until date Date when again open. 618 Conversion into holding company date Date business was converted into a holding company. 619 Deed not available as of given date Date when deed was not available. 620 Detrimental information receipt date Date when detrimental information was received. 621 Construction date, estimated Estimated date of construction. 622 Financial information date Date of the financial information. 623 Graduation date Date when graduation occurs. 624 Insolvency discharge granted date Date when insolvency discharge was granted. 625 Incorporation date Date of incorporation. 626 Inactivity end date Date when inactivity ends. 627 Last check for balance sheet update date Date balance sheet was last checked to determine if update had taken place. 628 Last capital change date Date of last capital change. 629 Letter of agreement date Date of a letter of agreement. 630 Letter of liability date Date of a letter of liability. 631 Liquidation date Date of liquidation. 632 Lowest activity period Period of lowest activity. 633 Legal structure change date Date when legal structure was changed. 634 Current name effective date Date when current name became effective. 635 Not registered as of given date Date when not yet registered. 636 Current authority control start date Date when current authority took control. 637 Privilege details verification date Date when privilege details were verified. 638 Current legal structure effective date Date when current legal structure became effective. 639 Peak activity period Period of peak activity. 640 Presentation to bankruptcy receivers date Date when presented to the bankruptcy receivers. 641 Resignation date Date of resignation. 642 Legal action closed date Date when the legal action was closed. 643 Mail receipt date Date mail was received. 644 Social security claims verification date Date when social security claims were verified. 645 Sole directorship registration date Date when sole directorship was registered. 646 Trade style registration date Date when trade style was registered. 647 Trial start date, scheduled Date when a trial is scheduled to begin. 648 Trial start date, actual Date when the trial actually started. 649 Value Added Tax (VAT) claims verification date Date when the Value Added Tax (VAT) claims were verified. 650 Receivership result date Date when the result of the receivership occurs. 651 Investigation end date The date when an investigation ended. 652 Employee temporary laid-off period end date The ending date of a period in which employees were temporarily placed out of work. 653 Investigation start date The date when an investigation began. 654 Income period The period of time in which income is earned. 655 Criminal sentence duration The period of time over which a criminal sentence applies. 656 Age Length of time that a person or animal has lived or a thing has existed. 657 Receivables collection period The period of time over which receivable accounts are collected. 658 Comparison period The time period covered in a comparison. 659 Adjournment The period of time over which an adjournment is in effect. 660 Court dismissal date The date on which a court refused further hearing of a case. 661 Insufficient assets judgement date The date on which assets were judged to be insufficient. 662 Average payment period The average period of time over which money has been paid. 663 Forecast period start The beginning of a forecast period. 664 Period extended Number of time units added to the original end date/time/period. 665 Employee temporary laid-off period start date The start date of a period in which employees were temporarily placed out of work. 666 Management available date Date when management is available. 667 Withdrawn date The date when something was retracted. 668 Claim incurred date The date that the claim was incurred. 669 Financial coverage period The period of time for which financial coverage applies. 670 Claim made date The date on which a claim was made. 671 Stop distribution date The date on which distribution is to stop. 672 Period assigned The period assigned. 673 Lease period The period associated with a lease. 674 Forecast period end date The ending date of a forecast period. 675 Judgement date The date on which a decision from a court of law was rendered. 676 Period worked for the company Period of time that was worked for the company. | 677 Transport equipment stuffing date and/or time (2045) The date and/or time on which the stuffing of transport equipment is to or has taken place. 678 Transport equipment stripping date and/or time The date and/or time on which the stripping of a transport equipment is to or has taken place. 679 Initial request date Date of an initial request. 680 Period overdue The period by which an event is overdue. 681 Implementation date/time/period A date/time/period within which an implementation is to take place. 682 Refusal period The period within which a refusal can be made. 683 Suspension period The period for which something is suspended. 684 Deletion date The date on which deletion occurs. 685 First sale date and/or time and/or period The first date, and/or time, and/or period a product was sold. 686 Last sale date and/or time and/or period The last date, and/or time, and/or period a product was sold. 687 Date ready for collection A date on which an object is ready for collection. 688 Shipping date, no schedule established as of As at this date no valid shipping schedule has been established. 689 Shipping date and/or time, current schedule Shipping date and/or time as currently scheduled. 690 Suppliers' average credit period The average period of time that credit is extended by suppliers. 691 Advising date Date of advice. 692 Project over target baseline date The date an over target baseline was implemented for a project. 693 Established date Date when an entity was established or created. 694 Latest filing period Latest period for which a filing may be made. 695 Mailing date Date when an item may be mailed. 696 Date/time of latest accounts filing at public registry The latest date/time when financial accounts were filed at public registry. 697 Date placed in disfavour Date when placed in a disfavoured category or status. 698 Employment position start date, estimated Estimated start date of employment in a particular position. 699 Registered contractor number assignment date, original Date when a registered contractor number was originally assigned. 700 Ownership change date Date when ownership changes. 701 Original duration Original length of time. 702 Period between changes The period of time between changes. 703 From date of notice to proceed to commencement of performance Period of time from notice to proceed until performance commencement. 704 From date of notice to proceed to completion Period of time from date of notice to proceed until completion. 705 Period an event is late due to customer The period of time an event is late due to the actions of a customer. 706 File generation date and/or time Date and, or time of file generation. 707 Endorsed certificate issue date Date on which a certificate, endorsed by signature or other agreed means, is issued. 708 Patient first visit for condition The date of the first visit by a patient to a healthcare provider for this condition. 709 Admission date and/or time, expected Expected date and/or time of admission. 710 Symptoms onset, patient alleged Date and/or time of onset of symptoms according to the patient. 711 Accident benefit period To identify the period of time for which benefits are provided in the event of an accident. 712 Accident benefit age limit To identify the age to which benefits are provided to the insured in the event of an accident. 713 Accident lifetime benefit qualification age To identify the qualification age for lifetime benefits provided to the insured in the event of an accident. 714 Sickness benefit period To identify the period of time for which benefits are provided in the event of sickness. 715 Sickness benefit age limit To identify the age to which benefits are provided to the insured in the event of sickness. 716 Sickness lifetime benefit qualification age To identify the qualification age for lifetime benefits provided to the insured in the event of sickness. 717 Accident insurance elimination period To identify the period of time the insured must be disabled in the event of an accident for benefits to be payable by the ceding company. 718 Sickness insurance elimination period The period of time the insured must be disabled in the event of sickness for benefits to be payable by the ceding company. 719 Provider signature date Date when the provider signed. 720 Condition initial treatment date Date when initially treated for this condition. 721 Information release authorization date Date when the information was authorized to be released. 722 Benefit release authorization date Date when a benefit is authorized for release. 723 Last seen date The date when last seen. 724 Acute manifestation date The date the symptoms manifested themselves in an acute form. 725 Similar illness onset date The date of the onset of an illness similar to the illness currently being treated. 726 Last X-ray date The date the last X-ray was taken. 727 Placement date, previous The date something was previously placed. 728 Placement date The date something is placed. 729 Temporary prosthesis date The date a temporary prosthetic device was provided. 730 Orthodontic treatment period, remaining The period of time that the orthodontic treatment has remaining. 731 Orthodontic treatment period, total The period of orthodontic treatment from beginning to end. 732 Maximum credit granted date Date on which the highest credit was granted. 733 Last date of accounts filed at public register Date on which accounts were last filed at the public register. 734 Allowed renewal duration period The period of time a company can renew its duration period. 735 Offset from Coordinated Universal Time (UTC) Number of hour's offset from Coordinated Universal Time (UTC). 736 Appointment expiry date Date when an appointment will expire. 737 Earliest filing period Earliest period for which a filing is made. 738 Original name change date Date when the original name was changed. 739 Education start date Date education begins at an educational institution. 740 Education end date Date education is completed at an educational institution. 741 Receivership period Period of time a receivership lasts. 742 Financial information submission date/time Date/time when financial information is submitted. 743 Purchase order latest possible change date Date identifying a point of time after which a purchase order cannot be changed. 744 Investment number allocation date The date that an investment number was allocated. 745 Payment impossible Date/time when a payment is recorded as being impossible. 746 Record extraction period The period for extraction of records. 747 Cost accounting value date Code identifying the value date of cost accounting. Value date is the date at which the entry is to effect a balance of the account. 748 Open period Code identifying the period during which something is, was or will be open. 749 Period between issue date and maturity date Interval of time between the date when the transaction was initiated and the date when the funds need to be collected. 750 Before date The specified before date. 751 After date The specified after date. 752 Meter reading date, next scheduled Date on which the next reading of a meter is scheduled to take place. 753 Maturity date, optimal Date at which optimal maturity occurs. 754 Product ageing duration, maximum Maximum period of time during which the product is ageing. 755 Product ageing duration, minimum Minimum period of time during which the product is ageing. 756 Ultimate documentation date/time for 24-hour rule regulation of CBP (United States Customs and Border Protection) Ultimate date/time by which the documentation must be submitted in compliance with the 4-hour rule of United States Custom of Border Protection. 757 Departure date/time from place of loading Date/time of the departure of the goods from the place of loading. 758 Trade item ship date/time, earliest possible The earliest date/time that the trade item can be shipped. 759 Trade item ship date/time, latest possible The latest date/time that the trade item can be shipped. 760 Start date/time, maximum buying quantity The date/time from which the maximum buying quantity may be purchased. 761 Start date/time, minimum buying quantity The date/time from which the minimum buying quantity may be purchased. 762 Marketing campaign end date/time, suggested The date and or time suggested for the marketing campaign to end. 763 Marketing campaign start date/time, suggested The date and or time suggested for the marketing campaign to start. 764 Start availability date The start date of availability. 765 Seasonal availabilty calendar year The calendar year of the season in which the trade item is available. 766 Goods pickup lead time Minimum time required between order entry and goods release for pick-up. 767 Change date/time, latest Most recent date and/or time that the information has been changed. 768 End date/time, maximum buying quantity The date and/or time until which the maximum buying quantity may be purchased. 769 End dat/time, minimum buying quantity The date and/or time until which the minimum buying quantity may be purchased. 770 End date/time of exclusivity The date and/or time until which a product is exclusive. 771 Data release date The date at which the data is released. 772 Handling start date and/or time, actual The actual date and/or time when the start of the handling action takes place. 773 Handling end date and/or time, estimated The date and/or time when the end of the handling action is estimated to take place. 774 Handling end date and/or time, actual The actual date and/or time when the end of the handling action takes place. 775 Minimum product lifespan for consumer The minimum life span of the product remaining after selling it to the consumer, i.e. between the "sell by date" and the "use by date" of the product. 776 Entry date, elected Date used at the discretion of the filer for duty calculation of non-quota goods when there is no immediate transport entry date (related to immediate delivery). 777 Arrival date/time at initial port with the intent to unload Date/ time that the conveyance arrives at the initial port in the country of destination. 778 Conveyance port activity date/ time The date and time of conveyance activity, including cargo loading or unloading, fuelling etc. 779 Date and time of importation into port limits Date and time on which the conveyance transporting the goods from the foreign country arrived within the limits of the port of destination. 780 Free trade zone commodity status assignment date The filing date that corresponds to the current status of the commodity in the free trade zone. 781 Jurisdiction entry date/time, actual Actual date/time at which the conveyance or goods enter an agency's jurisdiction. 782 Inspection start date/time Date/time at which an inspection begins. 783 Inspection end date/time Date/time at which an inspection is completed. 784 Document/message rejection date/time Date/time at which the document/message was rejected. 785 Government service date/time, requested The date/time at which the government service is requested to be executed. 786 Crop year The year that the crops were grown. 787 Date of original manufacture Date that the item was originally manufactured. 788 Model year The model year of the item. 789 Opened trade item life span The number of days the trade item that has been opened can remain on the shelf before it must be removed. 790 Unmooring, date and time Date and time of unmooring. 791 First crane lift Date and time of the first crane lift. 792 Last crane lift Date and time of the last crane lift. 793 Reprocessing date/time Date/time on which goods previously produced are re- processed. 794 First returnable date/time The first date/time on or after which items can be returned. 795 Community visibility date/time The date/time from which information becomes visible to the target community. ZZZ Mutually defined A code assigned within a code list to be used on an interim basis and as defined among trading partners until a precise code can be assigned to the code list.

Data Element Cross Reference

DataElement 2005 is used in the following Batch Composite Elements:

C507

DataElement 2005 is used in the following Interactive Composite Elements:

E013 E507

Copyright United Nations, all rights reserved
 
UN Economic Commission for Europe
Palais des Nations, CH-1211 Geneva 10, Switzerland
Tel: +41-22 917 2773 Fax: +41-22 917 0037 E-mail: [email protected]
 
UN/EDIFACT Directories