Change indicators
a plus sign (+) for an addition
an asterisk (*) for an amendment to structure
a hash sign (#) for changes to names
a vertical bar (|) for changes to text for descriptions and
notes
a minus sign (-) for marked for deletion (within either
batch and interactive messages)
a X sign (X) for marked for deletion (within both batch
and interactive messages)
2005 Date or time or period function code qualifier [C]
Desc: Code qualifying the function of a date, time or
period.
Repr: an..3
Code Values:
1 Service completion date/time, actual
Actual date/time on which the service was completed.
| 2 Delivery date/time, requested
(2105) Date on which buyer requests goods to be
delivered.
3 Invoice document issue date time
[2377] Date of issue of an invoice.
4 Order document issue date time
[2011] Date of order.
5 Saleable stock demand cover period, expected
A period of time when saleable stocks are expected to
cover demand for a product.
6 Moved from location date
The date an entity moved from a location.
7 Effective from date/time
(2069) Date and/or time at which specified event or
document becomes effective.
8 Order received date/time
Date/time when the purchase order is received by the
seller.
9 Processing date/time
Date/time of processing.
10 Shipment date/time, requested
Date on which goods should be shipped or despatched by
the supplier.
| 11 Despatch date and or time
[2171] Date/time on which the goods are or are expected
to be despatched or shipped.
12 Terms discount due date/time
Date by which payment should be made if discount terms
are to apply.
13 Terms net due date
Date by which payment must be made.
14 Payment date/time, deferred
Date/time when instalments are due.
15 Promotion start date/time
Date/time when promotion activities begin.
16 Promotion end date/time
Date/time when promotion activities end.
| 17 Delivery date/time, estimated
(2109) Date and/or time when the shipper of the goods
expects delivery will take place.
18 Installation date/time/period
The date/time/period of the act, or an instance of
installing something or someone.
19 Meat ageing period
Period of time between slaughter and delivery during
which meat is ageing.
20 Cheque date/time
Date/time when cheque is issued.
21 Charge back date/time
The date/time of the charge back.
22 Freight bill date/time
Date/time when freight bill is issued.
23 Equipment reconditioning date/time, actual
Actual date/time of the reconditioning of a piece of
equipment.
24 Transfer note acceptance date and time
Date and time when a transfer note (transfer document
for transport exclusively using containers as equipment)
is recognised as being valid by the carrier.
35 Delivery date/time, actual
Date/time on which goods or consignment are delivered at
their destination.
36 Expiry date
Date of expiry of the validity of a referenced document,
price information or any other referenced data element
with a limited validity period.
37 Ship not before date/time
Goods should not be shipped before given date/time.
38 Ship not later than date/time
Date/time by which the goods should have been shipped.
39 Ship week of date
Date identifying the week during which goods should be
shipped.
40 Clinical information issue date and/or time
Date and/or time when clinical information is issued.
41 Event duration, expected
The expected duration of an event.
42 Superseded date/time
Date/time being overlaid by a date given elsewhere.
43 Event duration, intended
The intended duration of an event.
44 Availability
Date/time when received item is available.
45 Compilation date and time
Date and time of the compilation.
| 46 Cancellation date
[2095] Date on which a document or message has been
cancelled.
47 Statistical time series date
Date for statistical time series purposes.
48 Duration
Duration.
49 Deliver not before and not after dates
Deliver not before and not after a specific date range.
50 Goods receipt date/time
Date/time upon which the goods were received by a given
party.
51 Cumulative quantity start date
First Date for accumulation of delivery quantities.
52 Cumulative quantity end date
Last Date for accumulation of delivery quantities.
53 Buyer's local time
Time at the buyer's location.
54 Seller's local time
Time at the seller's location.
55 Confirmed date/time
Date/time which has been confirmed.
56 Original authorisation date and/or time
Date and/or time when original authorisation was issued.
57 Precaution relevant period
The period when a precaution is relevant.
58 Clearance date (Customs)
Date on which Customs formalities necessary to allow
goods to be exported, to enter home use, or to be placed
under another Customs procedure has been accomplished
(CCC).
59 Inbound movement authorization date
Inland movement authorization date.
60 Engineering change level date
Date the engineering level of goods is changed.
61 Cancel if not delivered by this date
The date on which cancellation should take place, if
delivery has not occurred.
62 Excluded date
Date excluded from a period of time.
63 Delivery date time, last
[2025] Last date, and optionally time of a delivery.
| 64 Delivery date/time, earliest
[2091] Date identifying a point in time before which the
goods shall not be delivered.
65 Delivery date/time, 1st schedule
The first scheduled date/time for delivery.
66 Excluded period
An interval of time excluded from a period of time.
67 Delivery date/time, current schedule
Delivery Date deriving from actual schedule.
68 Additional period
An interval of time added to a period of time.
69 Delivery date time, promised before
[2139] Date and optionally time by which the merchandise
should be delivered to the buyer, as agreed between the
seller and the buyer (generic term).
70 Additional date
Date added to a period of time.
71 Delivery date/time, requested for (after and including)
Delivery is requested to happen after or on given date.
72 Delivery date/time, promised for (after and including)
Delivery might take place earliest at given date.
73 Guarantee period
The period for which the guarantee is or will be
granted.
74 Delivery date/time, requested for (prior to and including)
Delivery is requested to happen prior to or including
the given date.
75 Delivery date/time, promised for (prior to and including)
Delivery might take place latest at given date.
76 Delivery date/time, scheduled for
The date/time for which delivery is scheduled.
77 Specification revision date
Date of revision to a specification.
| 78 Event date/time/period, actual
[2193] The actual date/time/period an event occurred.
79 Shipment date/time, promised for
Shipment might happen at given date/time.
80 Planning end date and/or time, actual
The actual date and/or time the planning ended.
81 Shipment date/time, requested for (after and including)
Shipment should happen earliest at given date.
82 Medicine administration time
Designated time of day for the administration of
medicine.
83 Dispensing interval, minimum
The shortest interval allowed between one dispensing of
an item and the next dispensing of the same item.
84 Shipment date/time, requested for (prior to and including)
Shipment should take place latest at given date.
85 Shipment date/time, promised for (prior to and including)
Shipment might take place latest at given date.
86 Medication date/time, start
Date and/or time when medication was started.
87 Travel service connection time
Time elapsing between the arrival of a travel service
and the departure of a connecting travel service.
88 Summer time, start
Date/time at which the summer time starts.
89 Inquiry date
The date on which an inquiry is made.
90 Report start date
The date on which a report is to begin.
91 Report end date
The date on which a report is to end.
92 Contract effective date
Date when a contract becomes valid.
93 Contract expiry date
Date when a contract expires.
94 Production/manufacture date
Date on which goods are produced.
95 Bill of lading date
Date as specified on the bill of lading.
96 Discharge date/time
Date/time when goods should, might or have been
discharged from the means of transport.
97 Transaction creation date
The date on which a transaction was originated or
brought into being.
98 Winter time, start
Date/time at which the winter time starts.
99 Quotation opening date
The date on which the quotation has been or may be
opened.
100 Product ageing period before delivery
Period of time before delivery during which the product
is ageing.
101 Production date, no schedule established as of
Date as of there is no valid production schedule.
102 Health problem period
Period of time of health problem.
103 Closing date/time for breakbulk STORO
Date/time on which delivering period for breakbulk STORO
cargo ends (STORO = Stowing on Roll on-Roll off vessel).
104 Closing date/time for container RO-RO
Date/time on which delivering period for container Roll
on-Roll off (RO-RO) cargo ends.
105 Starting date/time for breakbulk STORO
Date/time on which delivering period for breakbulk STORO
cargo starts (STORO = Stowing on Roll on-Roll off
vessel).
106 Starting date/time for container RO-RO
Date/time on which delivering period for container Roll
on-Roll off (RO-RO) cargo starts.
107 Deposit date/time
The date/time on which a deposit was made.
108 Postmark date/time
An official mark stamped on a letter identifying
date/time of dispatch or arrival.
109 Receive at lockbox date
The date on which a financial institution, serving as
collection agency for a company located in another part
of the country, collects an amount of money on behalf of
that company.
110 Ship date, originally scheduled
The date on which the shipment of goods was originally
scheduled.
111 Manifest/ship notice date
The date of issuance of a manifest or ship notice.
112 First interest-bearing date
The first date from which interest is borne.
113 Sample required date
Date as of a sample has to be available customer
defined.
114 Tooling required date
Date as of a tool has to be available customer defined.
115 Sample available date
Date as of a sample will be available seller defined.
116 Equipment return period, expected
Period until which equipment is expected to be hired.
117 Delivery date/time, first
First possible date/time for delivery.
118 Cargo booking confirmed date/time
Date/time at which the cargo booking has been accepted
by the carrier.
119 Test completion date
Date when a test has been completed.
120 Last interest-bearing date
The last date from which interest is borne.
121 Entry date
Date of entry.
122 Contract completion date
The date a contract is completed.
123 Documentary credit expiry date/time
(2211) The latest date/time for presentation of the
documents to the bank where the credit expires.
124 Despatch note document issue date time
[2219] Issue date of a despatch note.
125 Import permit issue date time
[2293] Date of issue of an import licence.
126 Contract document issue date time
[2327] Date on which a contract is issued.
127 Previous report date
Date of the previous report.
128 Delivery date/time, last
Date when the last delivery should be or has been
accomplished.
129 Exportation date
[2043] Date when the imported vessel/merchandise last
left the country of export for the country of import.
130 Current report date
Date of the current report.
131 Tax point date time
[2221] Date on which tax is due or calculated.
132 Transport means arrival date time, estimated
[2349] Date and or time of the estimated arrival of
means of transport.
| 133 Transport means departure date/time, estimated
(2195) Date/time when carrier estimates that a means of
transport should depart at the place of departure.
134 Rate of exchange date/time
Date/time on which the exchange rate was fixed.
135 Telex date
Date identifying when a telex message was sent.
136 Transport means departure date time, actual
[2281] Date and or time of the departure of a means of
transport.
137 Document issue date time
[2007] Date that a document was issued and when
appropriate, signed or otherwise authenticated.
138 Payment availability date time
[2035] Date that an amount due becomes available to a
creditor under the terms of payment.
139 Property mortgage date, start
The date the mortgage on a piece of property begins.
| 140 Payment due date
[2481] Date/time at which funds should be made
available.
141 Customs declaration document lodgement date time
[2033] Presentation date of a declaration to customs.
142 Labour wage determination date
The date a labour wage is determined.
143 Consignment acceptance date time, actual
[2127] Actual date and optionally time when a
consignment of goods is taken over by the carrier at the
place of acceptance.
144 Quota date
Date that the quota applies to.
145 Event date
A date specifying an event.
146 Entry date, estimated (Customs)
Date on which the official date of Customs entry is
anticipated.
147 Export permit effective end date time
[2079] Date on which an export licence expires.
148 Goods declaration document acceptance date time
[2037] Date on which a Goods declaration has been or
will be accepted by Customs in accordance with Customs
legislation.
149 Invoice date, required
Date required for invoice issue.
150 Declaration/presentation date
Date when item has been or has to be declared/presented.
151 Importation date
Date on which goods are imported, as determined by the
governing Customs administration.
152 Exportation date for textiles
Date when imported textiles last left the country of
origin for the country of importation.
153 Cancellation date/time, latest
The latest date/time on which cancellation of the
payment order may be requested.
| 154 Acceptance date of document
[2097] The date on which a document was accepted.
155 Accounting period start date
The first date of an accounting period.
156 Accounting period end date
The last date of an accounting period.
157 Validity start date
The first date of a period for which something is valid.
158 Horizon start date
The first date of a period forming a horizon.
159 Horizon end date
The last date of a period forming a horizon.
160 Authorization date
Date when an authorization was given.
161 Release date of customer
Date the customer authorised the goods' release.
162 Release date of supplier
Date when the supplier released goods.
163 Processing start date/time
Date/Time when a specific process starts.
164 Processing end date/time
Date/Time when a specific process ends.
165 Tax period start date
Date when a tax period begins.
166 Tax period end date
Date when a tax period ends.
167 Charge period start date
The charge period's first date.
168 Charge period end date
The charge period's last date.
169 Lead time
Time required between order entry till earliest goods
delivery.
170 Settlement due date
More generic than 'payment due date' and therefore more
apt for reinsurance/insurance business.
171 Reference date/time
Date/time on which the reference was issued.
172 Hired from date
Date from which an item has been or will be hired.
173 Hired until date
Date until which an item has been or will be hired.
174 Advise after date/time
The information must be advised after the date/time
indicated.
175 Advise before date/time
The information must be advised before the date/time
indicated.
176 Advise completed date/time
The advise has been completed at the date indicated.
177 Advise on date/time
The information must be advised on the date/time
indicated.
178 Transport means arrival date time, actual
[2107] Date and or time of the arrival of means of
transport.
179 Booking date/time
Date at which the booking was made.
180 Closing date/time
Final date for delivering cargo to a liner ship.
181 Positioning date/time of equipment
Date/time when equipment is positioned.
182 Issue date
Date when a document/message has been or will be issued.
183 Date, as at
Date related to a given context.
184 Notification date/time
Date/time of notification.
185 Commenced tank cleaning date/time
The date/and or time tank cleaning was started.
186 Transport means departure date/time, actual
(2280) Date (and time) of departure of means of
transport.
187 Authentication date/time of document
Date/time when the document is signed or otherwise
authenticated.
188 Previous current account date
Date of the previous current account.
189 Transport means departure date/time, scheduled
Date (and time) of scheduled departure of means of
transport.
190 Transhipment date/time
Date and time of the transfer of the goods from one
means of transport to another.
191 Delivery date/time, expected
Date/time on which goods are expected to be delivered.
192 Expiration date/time of customs document
Date on which validity of a customs document expires.
193 Execution date
The date when ordered bank initiated the transaction.
194 Start date/time
Date/time on which a period starts.
195 Import permit effective end date time
[2273] Date on which the validity of an import licence
expires.
196 Transport means departure date/time, earliest
Date/time of earliest departure of means of transport.
197 Lay-time first day
First of a number of days allowed in a charter party of
the loading and discharging of cargo.
198 Lay-time last day
Last of a number of days allowed in a charter party for
the loading and discharging of cargo.
199 Positioning date/time of goods
The date and/or time the goods have to be or have been
positioned.
200 Cargo pick-up date / time
Date/time at which the cargo is picked up. Synonym:
collected.
201 Equipment pick-up date / time
Date/time at which the equipment is picked up.
202 Posting date
The date when an entry is posted to an account.
203 Execution date/time, requested
The date/time on which the ordered bank is requested to
initiate the payment order, as specified by the
originator (e.g. the date of the debit).
| 204 Release date (Customs)
(2135) Date on which Customs releases merchandise to the
carrier or importer.
205 Settlement date
Date for settlement of financial transaction e.g.
foreign exchange securities.
206 End date/time
Date/time on which a period (from - to) ends.
207 Commenced pumping ballast date/time
Date/time on which the intake of materials to be carried
to improve the trim and the stability of the means of
transport, was commenced.
208 Transport means departure date/time, ultimate
Date/time at which a means of transport has to depart
ultimately.
209 Value date
Date on which the funds are at the disposal of the
beneficiary or cease to be at the disposal of the
ordering customer.
210 Reinsurance current account period
The date of the current reinsurance account.
211 360/30
Calculation is based on year of 360 days, month of 30
days.
212 360/28-31
Calculation is based on year of 360 days, month of 28-31
days.
213 365-6/30
Calculation is based on year of 365-6 days, month of 30
days.
214 365-6/28-31
Calculation is based on year of 365-6 days, month of 28-
31 days.
215 365/28-31
Calculation is based on year of 365 days, month of 28-31
days.
216 365/30
Calculation is based on year of 365 days, month of 30
days.
217 From date of award to latest delivery
Lead time to determine the latest date a delivery can be
made based on the date an award is made.
218 Authentication/validation date/time
The date/time of authentication and/or validation.
219 Crossborder date/time
Date/time at which goods are transferred across a
country border.
220 Property mortgage scheduled date, end
The date the mortgage on a piece of property is
scheduled to end.
221 Interest period
Number of days used for the calculation of interests.
222 Presentation date, latest
Latest date for presentation of a document.
223 Delivery date/time, deferred
New date and time of delivery calculated on basis of a
consignee's requirement (chargeable).
224 Permit to admit date
Date on which permission was granted to move merchandise
into a bonded warehouse or free trade zone.
225 Certification of weight date/time
Date/time at which the carrier proceeds to the weighting
of the goods.
226 Discrepancy date/time
Date/time at which a discrepancy has been found.
227 Beneficiary's banks due date
Date on which funds should be made available to the
beneficiary's bank.
228 Debit value date, requested
Date on which the account owner wants the debit value to
his account.
229 Hoses connected date/time
The date and/or time hoses were connected.
230 Hoses disconnected date/time
The date and/or time hoses were disconnected.
231 Transport means arrival date/time, earliest
Date/time of earliest arrival of means of transport.
232 Transport means arrival date/time, scheduled
Date (and time) of scheduled arrival of means of
transport.
233 Transport means arrival date/time, ultimate
Date (and time) of ultimate arrival of means of
transport.
234 Collection date/time, earliest
The transport order may be issued before the goods are
ready for picking up. This date/time indicates from when
on the carrier can have access to the consignment.
235 Collection date/time, latest
In relation with the arrangements agreed between buyer
and seller or between sender and main transport it may
be necessary to specify the latest collection date/time.
236 Completed pumping ballast date/time
Date/time at which the intake of materials, to be
carried to improve the trim and the stability of the
means of transport, was completed.
237 Completed tank cleaning date/time
The date and/or time tank cleaning was completed.
238 Tanks accepted date/time
The date and/or time the tanks are to be or have been
accepted.
239 Tanks inspected date/time
The date and/or time the tanks are to be or have been
inspected.
240 Reinsurance accounting period
To identify a reinsurance account period via start and
end dates.
Note:
1. This period is not the same as "reinsurance current
account period".
241 From date of award to earliest delivery
Lead time to determine the earliest date a delivery can
be made based on the date an award is made.
242 Preparation date/time of document
Date and/or time that the document was prepared.
243 Transmission date/time of document
The date/time at which a document was transmitted.
244 Settlement date, planned
The date for which settlement is planned.
245 Underwriting year
Year in which the treaty was commenced.
246 Accounting year
Year considered for accounting of the treaty or portion
of the treaty.
247 Year of occurrence
Year in which a specific event (e.g. a loss) took place.
248 Loss
Date, time, period on which a referenced loss occurred.
249 Cash call date
Date on which a cash call was made for a loss suffered
and covered.
250 Re-exportation date
Date of re-exportation.
251 Re-importation date
Date of re-importation.
252 Arrival date/time at initial port
Date/time that the conveyance arrives at the initial
port in the country of destination.
253 Departure date/time from last port of call
Date/time that conveyance departed from the last foreign
port of call.
254 Registration date of previous Customs declaration
Registration date of the Customs declaration for the
previous Customs procedure either in the same or another
country.
255 Availability due date
Date when ordered items should be available at a
specified location.
256 From date of award to completion
Lead time to determine the completion date of an effort
based on the date an award is made.
257 Calculation date time
[2253] Date on which the calculation was made.
258 Guarantee date
Date when a guarantee is placed.
| 259 Conveyance registration date
[2063] Date when a vessel, vehicle or other means of
transport was registered by a competent authority.
260 Valuation date (Customs)
Date when Customs valuation was made.
261 Release date/time
Date/time assigned to identify the release of a set of
rules, conditions, conventions, productions, etc.
262 Closure date/time/period
Date/time/period when an enterprise is closed.
263 Invoicing period
Period for which an invoice is issued.
264 Release frequency
Frequency of a release.
265 Due date
The date on which some action should occur.
266 Validation date
The date on which something was made valid, ratified or
confirmed.
267 Rate/price date/time
Date/time on which a rate/price is determined.
268 Transit time/limits
The time to go over a distance.
269 Discharge date/time, started
Date/time when discharge operations were started.
270 Ship during date
The date identifying the period during or in which the
goods should be shipped.
271 Ship on or about date
Date on or about which goods should be shipped.
| 272 Documentary credit presentation period
[2060] The specification of the period of time,
expressed in number of days, after the date of issuance
of the transport document(s) within which the documents
must be presented.
273 Validity period
Dates (from/to)/period referenced documents are valid.
274 From date of order receipt to sample ready
Lead time is the defined timespan.
275 From date of tooling authorization to sample ready
Lead time is the defined timespan.
276 From date of receipt of tooling aids to sample ready
Lead time is the defined timespan.
277 From date of sample approval to first product shipment
Lead time is the defined timespan.
278 From date of order receipt to shipment
Lead time is the defined timespan.
279 From date of order receipt to delivery
Lead time is the defined timespan.
280 From last booked order to delivery
Lead time is the defined timespan.
281 Date of order lead time
Lead time is referenced to the date of order.
282 Confirmation date lead time
Lead time is referenced to the date of confirmation.
283 Arrival date/time of transport lead time
Lead time is referenced to the date a transport will
arrive or has arrived.
284 Before inventory is replenished based on stock check lead
time
Lead time is the defined timespan.
285 Invitation to tender date/time
Date/time on which the invitation to tender has been
made available to relevant parties.
286 Tender submission date/time
Date/time on which the tender was submitted.
287 Contract award date/time
Date/time on which the contract is awarded to a
tenderer.
288 Price base date/time
Base date/time of prices.
289 Interest rate validity period
Validity period of the interest rate.
290 Contractual start date/time
Date/time on which activities stated in the contract
must start.
291 Start date/time, planned
The date/time for which something is planned to begin or
commence.
292 Works completion date/time, planned
The date/time for the completion of building or repair
operations is planned.
293 Works completion date/time, actual
The actual date/time for the completion of building or
repair operations.
294 Hand over date/time, planned
Date/time on which hand over (i.e. the transfer of
responsibility for an object or activity such as
documentation, system etc. from one party to another) is
planned to take place.
295 Hand over date/time, actual
Date/time on which hand over (i.e. the transfer of
responsibility for an object or activity such as
documentation, system etc. from one party to another)
actually takes place.
296 Retention release date/time
Date/time on which the retention is released.
297 Retention release date/time, partial
Date/time on which the retention is partially released.
298 Goods pick-up date / time, planned
Date/time at which goods can be picked up, according to
a plan.
299 Price adjustment start date
Value date of the indexes appearing as denominators in a
price adjustment formula.
300 Price adjustment limit date
Limit value date of indexes used as numerators in a
price adjustment formula.
301 Value date of index
Date of validity of index values.
302 Publication date
The date of the act of making something publicly known.
303 Escalation date
Value date of indexes appearing as numerators in an
escalation formula.
304 Price adjustment date
Value date of indexes appearing as numerators in a price
adjustment formula.
305 Latest price adjustment date
Date on which the latest price adjustment took place.
306 Work period
Period of execution of works.
307 Payment instruction date/time
Date/time on which a payment instruction was given.
308 Payment valuation presentation date/time
Date/time on which the payment valuation is presented.
309 Banks' value date
Date on which the funds are at the disposal of the
receiving bank or cease to be at the disposal of the
sending bank.
310 Received date/time
Date/time of receipt.
311 On
Fixed maturity day for deferred payment or time
draft(s).
312 Ship not before and not after date/time
Shipment(s) of goods is/are to be made not before the
first specified date/time and not after the second
specified date/time.
313 Order to proceed date
Issue date of an instruction to start work.
314 Planned duration of works
The period of time planned for the completion of
building or repair operations.
315 Agreement to pay date
Date on which the debtor agreed to pay.
316 Valuation date/time
Date/time of valuation.
317 Reply date
The date to answer or to respond in word or action.
318 Request date
The date on which something was asked for.
319 Customer value date
Date at which funds are taken into account for interest
calculation (in debit or credit).
320 Declaration reference period
Reference period of a set of items reported on the same
declaration.
321 Promotion date/period
Date/period relevant for specific promotion activities.
322 Accounting period
A period of time for the recording of financial
transactions for accounting.
323 Horizon period
Period forming a (planning) horizon.
324 Processing date/period
Date/period a specific process happened/will happen.
325 Tax period
Period a tax rate/tax amount etc. is applicable.
326 Charge period
Period a specified charge is valid for.
327 Instalment payment due date
Date on which an instalment payment is due.
328 Payroll deduction date/time
Date/time of a monetary deduction made from the salary
of a person on a payroll.
| 329 Person birth date time
[2491] (2051) Date on which an individual is or was
born.
330 Joined employer date
Date when a person joins an employer.
331 Contributions ceasing date/time
Date/time when contributions cease.
332 Contribution period end date/time
Date/time when a contribution period ends.
333 Part-time working change date/time
Date/time when the proportion of part-time work changes.
334 Status change date/time
Date/time when a status changes.
335 Contribution period start date/time
Date/time when a contribution period commences.
336 Salary change effective date
Date when a change in salary becomes effective.
337 Left employer date
Date when a person leaves an employer.
338 Benefit change date/time
Date/time when a benefit provided by a service provider
is changed.
339 Category change date/time
Date/time when a change of category is made.
340 Joined fund date/time
Date/time when a person joins a fund.
341 Waiting time
The period of time between the moment at which one wants
an activity to begin and the moment at which this
activity can actually begin.
342 Consignment loading date time
[2347] Date and optionally time when a consignment is to
be or has been loaded onto a means of transport.
343 Date/time of discount termination
Date/time when the deduction from an amount comes to an
end.
344 Date/time of interest due
Date/time when the interest has to be paid.
345 Days of operation
Week days of operation.
346 Latest check-in time
Latest time of check-in.
347 Slaughtering start date
Date on which slaughtering commenced.
348 Packing start date
Date on which packing commenced.
349 Packing end date
Date on which packing completed.
350 Test start date
Date when a test has been started.
351 Inspection date
Date of inspection.
352 Slaughtering end date
Date on which slaughtering completed.
353 Accounting transaction date
Date to which an accounting transaction refers.
354 Activity period date range
A specific date range associated with an activity.
355 Contractual delivery date
The date of delivery contractually agreed between
parties.
356 Sales date, and or time, and or period
The date, and or time, and or period on which a sale
took place.
357 Cancel if not published by this date
Cancel if not published by this date.
358 Scheduled for delivery on or after
Scheduled for delivery on or after the specified date,
and or time.
359 Scheduled for delivery on or before
Scheduled for delivery on or before specified date and
or time.
360 Sell by date
The date by which a product should be sold.
361 Product best before date time
[2497] Indication that freshness of goods is limited in
time to the date shown.
362 End availability date
The end date of availability.
363 Total shelf life period
A period indicating the total shelf life of a product.
364 Minimum shelf life remaining at time of despatch period
Period indicating the minimum shelf life remaining for a
product at the time of leaving the supplier.
365 Packaging date
The date on which the packaging of a product took place.
366 Inventory report date
Date on which a inventory report is made.
367 Meter reading date, previous
Date on which the previous reading of a meter took
place.
368 Meter reading date, latest
Date on which the latest reading of a meter took place.
369 Date and or time of handling, estimated
The date and or time when the handling action is
estimated to take place.
370 Date when container equipment becomes domestic
The date on which foreign-built container equipment has
entered into the commerce of another country and has
become domestic equipment.
371 Hydrotest date
The date equipment has been hydrotested.
372 Equipment pre-trip date
The date on which equipment is pre-tripped.
373 Mooring, date and time
Date and time of mooring.
374 Road fund tax expiry date
The date of expiry of the road fund tax.
375 Date of first registration
Date of first registration.
376 Biannual terminal inspection date
The date on which a biannual inspection of a terminal
has taken or will take place.
377 Federal HighWay Administration (FHWA) inspection date
The date on which container equipment is to be or has
been inspected in accordance with the requirements of
the U.S. Federal Highway Administration.
378 Container Safety Convention (CSC) inspection date
The date on which container equipment is to be or has
been inspected as per the Container Safety Convention
(CSC).
379 Periodic inspection date
The date on which a periodic inspection has to take
place.
380 Drawing revision date
Date the drawing revision has been allocated to a
design.
381 Product lifespan at time of production
The total lifespan of a product at the time of its
production.
382 Earliest sale date
The earliest date on which the product may be made
available for sale.
383 Cancel if not shipped by this date
Cancel the order if goods not shipped by this date.
384 Previous invoice date
Indicates the date which was allocated to a previous
invoice.
385 Payment cancelled, violation of agreement
Date/time when a payment is cancelled due to the fact
that the transaction does not comply with the agreement.
386 Payment cancelled due to administrative error
Date/time when a payment is cancelled due to an
administrative error.
387 Repair turnaround time
Provides the period of time necessary to turnaround a
given repair.
388 Order amendment binding date
The date when an order amendment becomes binding for
both parties.
389 Cure time
Specifies the length of time that an article was or
should be cured.
390 From date of award to delivery
Lead time to determine the delivery date based on the
date an award is made.
391 From date of receipt of item to approval
Lead time to determine the date an item will be approved
based on the date the item was received.
| 392 Equipment pick-up date / time, earliest
[2125] Earliest date/time at which the equipment can be
picked up.
393 Equipment pick-up date / time, planned
Date/time at which equipment can be picked up, either
full or empty, according to a plan.
394 Equipment positioning date/time, actual
Date/time on which equipment was actually positioned
(delivered).
395 Equipment positioning date/time, estimated
Date/time on which equipment is estimated to be
positioned (delivered).
396 Equipment positioning date/time, requested
Date/time on which equipment is requested to be
positioned (delivered).
397 Equipment positioning date/time, ultimate
Date/time on which equipment should be positioned
(delivered) at the latest.
398 Goods collection or pick-up date/time, planned
Date/time at which goods can be picked up, according to
a planning.
399 Goods positioning date/time, expected
Date/time on which goods are expected to be positioned.
400 Cargo release date/time, ultimate
Ultimate date/time at which goods or equipment should be
released.
401 Container Safety Convention (CSC) plate expiration date
Date on which the validity of a Container Safety
Convention (CSC) plate expires.
402 Document received date/time
Date/time on which the document was actually received.
403 Discharge date/time, actual
Date/time when the specified goods or transport
equipment has or have been discharged from the means of
transport.
404 Transport means loading date/time, actual
Date/time when the specified goods or transport
equipment has or have been loaded in or on the means of
transport.
| 405 Equipment pick-up date / time, actual
[2123] Date/time on which the equipment was actually
collected.
406 Goods positioning date/time, planned
The date/time on which the goods will be positioned
according to a planning.
407 Document requested date/time
Date/time on which the document is requested by a party.
408 Expected container hire from date/time
Estimated date and time when the containers are expected
to go on-hire.
409 Order completion date/time, ultimate
Date/time on which the order should be completed at the
latest.
410 Equipment repair ready date/time, ultimate
Ultimate date/time on which a piece of equipment must be
repaired.
411 Container stuffing date/time, ultimate
Date/time on which the container stuffing should be
completed at the latest.
412 Container stripping date/time, ultimate
Date/time on which the container stripping should be
completed at the latest.
413 Discharge and loading completed date/time
Date/time when all discharge and loading operations on
the transport means have been completed.
414 Equipment stock check date/time
Date/time on which equipment has been ascertained as
being in stock.
415 Activity reporting date
The date applicable to the activity being reported.
416 Submission date
The date of a submission.
417 Previous booking date/time
Date/time at which the previous booking was made.
418 Minimum shelf life remaining at time of receipt
The minimum shelf life remaining at the time of receipt.
419 Forecast period
A period for which a forecast applies.
420 Unloaded, date and time
To report the date and time that an unloading action
occurred.
421 Estimated acceptance date
To estimate the date of acceptance.
422 Documentary credit issue date
The date the documentary credit has been issued.
423 First date of ordering
The first date on which ordering may take place.
424 Last date of ordering
The last date on which ordering may take place.
425 Original posting date
Date when the entry was originally posted.
426 Reinsurance payment frequency
The frequency of payments of reinsurance premiums.
427 Adjusted age
The adjusted age used for purposes of calculation.
428 Original issue age
The original issue age.
429 Coverage duration
The period coverage has been in force.
430 Coverage issue date
Date from which the anniversary coverage is measured.
431 Flat extra period
Period for charging the additional extra.
432 Paid to date
Date to which payments have been paid.
433 Reinsurance coverage duration
The period for which reinsurance coverage has been in
force.
434 Maturity date
Date at which maturity occurs.
435 Reinsurance issue age
The actual or equivalent age at time of issue.
436 Reinsurance paid-up date
The date up to which the reinsurance has been paid.
437 Benefit period
The period of time for which benefits are provided.
438 Disability wait period
The period of time the insured must be disabled before
reinsurance coverage becomes effective.
439 Deferred Period
The period of time for which an activity has been
postponed.
440 Documentary credit amendment date
Date of amendment of a documentary credit.
441 Last on hire date
Date the item was last placed on hire.
442 Last off hire date
Date the item was last returned from hire.
443 Direct interchange date
Date the item was directly interchanged.
444 Approval date
Date of approval.
445 Original estimate date
The date of the original estimate.
446 Revised estimate date
The date the estimate was revised.
447 Creditor's requested value date
Date on which the creditor requests to be credited.
448 Referenced item creation date
Creation date of referenced item.
449 Date for the last update
Date for the last update.
450 Opening date
Date of opening.
451 Source document capture date
Date source document data is entered into a business
application.
452 Trial balance period
Period covered by the trial balance.
453 Date of source document
The date of the source document.
454 Accounting value date
Date against which the entry has to be legally
allocated.
455 Expected value date
Date on which the funds are expected to be at the
disposal of the beneficiary.
456 Chart of account period
Period covered by the chart of account.
457 Date of separation
Date of marital separation.
458 Date of divorce
Date when two married persons are officially divorced.
459 Date of marriage
Date when two persons are married.
460 Wage period, start date
Date when a period of wage begins.
461 Wage period, end date
Date when a period of wage ends.
462 Working period, start date
Date when a period of work begins.
463 Working period, end date
Date when a period of work ends.
464 Embarkation date and time
Date and time at which crew and/or passengers board.
465 Disembarkation date and time
Date and time at which crew and/or passengers disembark.
466 Time now date
A time now date used for planning and scheduling
purposes.
467 Holiday
A date or period that is a break from work.
468 Non working
To specify a non working date or period.
469 Start date or time, earliest
The earliest date or time for starting.
470 Start date or time, latest
The latest date or time for starting.
471 Finish date or time, earliest
The earliest date or time for finishing.
472 Finish date or time, latest
The latest date or time for finishing.
473 Start date or time, mandatory
The mandatory date or time for starting.
474 Finish date or time, mandatory
The mandatory date or time for finishing.
475 Start date or time, actual
The actual date or time for starting.
476 Start date or time, estimated
The estimated date or time for starting.
477 Completion date or time, estimated
The estimated date or time for completion.
478 Start date or time, scheduled
The scheduled date or time for starting.
479 Completion date or time, scheduled
The scheduled date or time for completion.
480 Start date or time, not before
The not before date or time for starting.
481 Start date or time, not after
The not after date or time for starting.
482 Completion date or time, not before
The not before date or time for completion.
483 Completion date or time, not after
The not after date or time for completion.
484 Illness recovery date, expected
Date when a person is expected to recover from illness.
485 Period of illness, start date
Date when a period of illness began.
486 Period of illness, end date
Date when a period of illness ends.
487 Decease date
Date when a person died.
488 Benefit period, start date
Date when a period of benefit begins.
489 Benefit period, end date
Date when a period of benefit ends.
490 Selection period, start date
Date when a period of selection begins.
491 Selection period, end date
Date when a period of selection ends.
492 Balance date/time/period
The date/time/period of a balance.
493 Benefit payments termination date
To identify the date on which benefit payments have
ceased.
494 Covered income period
To identify the period over which covered income is
measured.
495 Current income period
To identify the period over which current income is
measured.
496 Reinstatement date
Identifies the date of reinstatement.
497 Definition of disability duration
To identify the period for which the definition of
disability applies.
498 Previous termination date
Identifies the date of the previous termination.
499 Premium change period
To identify the period of the premium change.
500 Off-hire survey date
Date on which the equipment was surveyed at the end of
the current leasing period.
501 In service survey date
Date of survey of equipment while in use.
502 On hire survey date
Date on which the equipment was surveyed at the
beginning of the current leasing period.
503 Production inspection date
Date of production inspection.
504 Overtime, start date
Date when a period of overtime begins.
505 Overtime, end date
Date when a period of overtime ends.
506 Back order delivery date/time/period
The date/time/period during which the delivery of a back
order will take, or has taken, place.
507 Negotiations start date
The date on which negotiations started.
508 Work effective start date
The date on which work will effectively start.
510 Notification time limit
The time limit which has been set for a notification to
take place.
511 Time limit
The time limit in which an event must take place.
512 Attendance date and or time and or period
Date and or time and or period of attendance.
513 Accident date and or time
Date and or time when an accident occurred.
514 Adoption date, actual
Actual date when adoption occurs.
515 Reimbursement claim issue date and or time
Date and or time when a reimbursement claim is issued.
516 Hospital admission date and or time
Date and or time of admission to a hospital.
517 Hospital discharge date and or time
Date and or time of discharge from a hospital.
518 Period of care start date and or time
Date and or time when a period of care starts.
519 Period of care end date and or time
Date and or time when a period of care ends.
520 Department admission date and or time
Date and or time of admission to a department.
521 Department discharge date and or time
Date and or time of discharge from a department.
522 Childbirth date and or time, actual
Actual date and or time of childbirth.
523 Prescription issue date and or time
Date and or time when a prescription was issued.
524 Prescription dispensing date and or time
Date and or time when a prescription was dispensed.
525 Clinical examination date and or time
Date and or time of clinical examination.
526 Death date and or time
Date and or time of death.
527 Childbirth date, estimated
Estimated date of childbirth.
528 Last menstrual cycle, start date
Date when the last menstrual cycle started.
529 Pregnancy duration, actual
Actual duration of pregnancy.
530 Fumigation date and/or time
The date/or time on which fumigation is to occur or has
taken place.
531 Payment period
A period of time in which a payment has been or will be
made.
532 Average delivery delay
The average delay between deliveries.
533 Budget line application date
The date on which something has been applied to a budget
line.
534 Date of repair or service
The date of a repair or service.
535 Date of product failure
The date the product failed.
536 Review date
Date the item was or will be reviewed.
537 International review cycle start date
Date the international review cycle starts.
538 International assessment approval for publication date
Date the Data Maintenance Request (DMR) was approved for
publication after completing international review.
539 Status assignment date
Date a status was assigned.
540 Instruction's original execution date
Original execution date for the instruction.
541 First published date
Date when material was first published.
542 Last published date
Date when material was last published.
543 Balance sheet date, latest
Date of the latest balance sheet.
544 Security share price as of given date
Date of the security share price.
545 Assigned date
Date when assigned.
546 Business opened date
Date opened for business.
547 Initial financial accounts filed date
Date when the initial financial accounts were filed.
548 Stop work as of given date
Date work stopped or will stop.
549 Completion date
Date of completion.
550 Lease term, start date
Start date of the lease term.
551 Lease term, end date
End date of the lease term.
552 Start date, actual
Actual date of start.
553 Start date, estimated
Date of estimated start.
554 Filed date
Date when filed.
555 Return to work date
Date of return to work.
556 Purchased date
Date of purchase.
557 Returned date
Date return takes place.
558 Changed date
Date change takes place.
559 Terminated date
Date termination takes place.
560 Evaluation date
Date evaluation takes place.
561 Business termination date
Date the business terminates.
562 Release from bankruptcy date
Date when an entity is released from bankruptcy status.
563 Placement date, initial
Date of initial placement.
564 Signature date
Date of signature.
565 Bankruptcy filed date
Date when bankruptcy was filed.
566 End date, scheduled
Date when activity is scheduled to end.
567 Report period
Period covered by the report.
568 Suspended date
Date of suspension.
569 Renewal date
Date of renewal.
570 Reported date
Date when reported.
571 Checked date
Date when checked.
572 Present residence, start date
The beginning date of residence at present location.
573 Employment position, start date
The start date of employment in a particular position.
574 Account closed date
Date when account was closed.
575 Construction date, actual
Date of actual construction.
576 Employment profession start date
Start date of employment in a particular profession.
577 Next review date
Date of next review.
578 Meeting date
Date of the meeting.
579 Administrator ordered date
Date when an administrator is ordered for a company.
580 Last date to file a claim
Date after which no claim can be filed.
581 Convicted date
Date when convicted.
582 Interviewed date
Date of an interview.
583 Last visit date
Date of last visit.
584 Future period
Period in the future.
585 Preceding period
Period preceding current period.
586 Expected problem resolution date
Date when problem is expected to be resolved.
587 Action date
Date of action.
588 Accountant's opinion date
Date of an accountant's opinion.
589 Last activity date
Date of last activity.
590 Resolved date
Date when resolved.
591 Recorded date
Date when recorded.
592 Date of birth, estimated
The estimated date of birth.
593 Last annual report date
Date of the last annual report.
594 Net worth date
Date of net worth.
595 Payment cancellation rejected
Date/time when a cancellation of a payment is rejected
due to the fact that the payment is already done.
596 Profit period
Period over which profit was earned.
597 Registration date
Date when registered.
598 Consolidation date
Date when consolidation occurred.
599 Board of directors not authorised as of given date
As of this date the board of directors is not
authorised.
600 Board of directors not complete as of given date
As of this date the board of directors is not fully
filled.
601 Manager not registered as of given date
As of this date the manager is not registered.
602 Citizenship change date
Date of citizenship change.
603 Participation date
Date of participation.
604 Capitalisation date
Date of capitalisation.
605 Board of directors registration date
Date when the board of directors was registered.
606 Operations ceased date
Date when operations ceased.
607 Satisfaction date
Date when satisfaction was obtained.
608 Legal settlement terms met date
Date when terms specified in the legal settlement were
met.
609 Business control change date
Date when a new authority took control.
610 Court registration date
Date of registration in the court.
611 Annual report due date
Date when annual report is due.
612 Asset and liability schedule date
Date of the asset and liability schedule.
613 Annual report mailing date
Date when the annual report was mailed.
614 Annual report filing date
Date when the annual report was filed.
615 Annual report delinquent on date
Date when annual report was considered delinquent.
616 Accounting methodology change date
Date when accounting methodology was changed.
617 Closed until date
Date when again open.
618 Conversion into holding company date
Date business was converted into a holding company.
619 Deed not available as of given date
Date when deed was not available.
620 Detrimental information receipt date
Date when detrimental information was received.
621 Construction date, estimated
Estimated date of construction.
622 Financial information date
Date of the financial information.
623 Graduation date
Date when graduation occurs.
624 Insolvency discharge granted date
Date when insolvency discharge was granted.
625 Incorporation date
Date of incorporation.
626 Inactivity end date
Date when inactivity ends.
627 Last check for balance sheet update date
Date balance sheet was last checked to determine if
update had taken place.
628 Last capital change date
Date of last capital change.
629 Letter of agreement date
Date of a letter of agreement.
630 Letter of liability date
Date of a letter of liability.
631 Liquidation date
Date of liquidation.
632 Lowest activity period
Period of lowest activity.
633 Legal structure change date
Date when legal structure was changed.
634 Current name effective date
Date when current name became effective.
635 Not registered as of given date
Date when not yet registered.
636 Current authority control start date
Date when current authority took control.
637 Privilege details verification date
Date when privilege details were verified.
638 Current legal structure effective date
Date when current legal structure became effective.
639 Peak activity period
Period of peak activity.
640 Presentation to bankruptcy receivers date
Date when presented to the bankruptcy receivers.
641 Resignation date
Date of resignation.
642 Legal action closed date
Date when the legal action was closed.
643 Mail receipt date
Date mail was received.
644 Social security claims verification date
Date when social security claims were verified.
645 Sole directorship registration date
Date when sole directorship was registered.
646 Trade style registration date
Date when trade style was registered.
647 Trial start date, scheduled
Date when a trial is scheduled to begin.
648 Trial start date, actual
Date when the trial actually started.
649 Value Added Tax (VAT) claims verification date
Date when the Value Added Tax (VAT) claims were
verified.
650 Receivership result date
Date when the result of the receivership occurs.
651 Investigation end date
The date when an investigation ended.
652 Employee temporary laid-off period end date
The ending date of a period in which employees were
temporarily placed out of work.
653 Investigation start date
The date when an investigation began.
654 Income period
The period of time in which income is earned.
655 Criminal sentence duration
The period of time over which a criminal sentence
applies.
656 Age
Length of time that a person or animal has lived or a
thing has existed.
657 Receivables collection period
The period of time over which receivable accounts are
collected.
658 Comparison period
The time period covered in a comparison.
659 Adjournment
The period of time over which an adjournment is in
effect.
660 Court dismissal date
The date on which a court refused further hearing of a
case.
661 Insufficient assets judgement date
The date on which assets were judged to be insufficient.
662 Average payment period
The average period of time over which money has been
paid.
663 Forecast period start
The beginning of a forecast period.
664 Period extended
Number of time units added to the original end
date/time/period.
665 Employee temporary laid-off period start date
The start date of a period in which employees were
temporarily placed out of work.
666 Management available date
Date when management is available.
667 Withdrawn date
The date when something was retracted.
668 Claim incurred date
The date that the claim was incurred.
669 Financial coverage period
The period of time for which financial coverage applies.
670 Claim made date
The date on which a claim was made.
671 Stop distribution date
The date on which distribution is to stop.
672 Period assigned
The period assigned.
673 Lease period
The period associated with a lease.
674 Forecast period end date
The ending date of a forecast period.
675 Judgement date
The date on which a decision from a court of law was
rendered.
676 Period worked for the company
Period of time that was worked for the company.
| 677 Transport equipment stuffing date and/or time
(2045) The date and/or time on which the stuffing of
transport equipment is to or has taken place.
678 Transport equipment stripping date and/or time
The date and/or time on which the stripping of a
transport equipment is to or has taken place.
679 Initial request date
Date of an initial request.
680 Period overdue
The period by which an event is overdue.
681 Implementation date/time/period
A date/time/period within which an implementation is to
take place.
682 Refusal period
The period within which a refusal can be made.
683 Suspension period
The period for which something is suspended.
684 Deletion date
The date on which deletion occurs.
685 First sale date and/or time and/or period
The first date, and/or time, and/or period a product was
sold.
686 Last sale date and/or time and/or period
The last date, and/or time, and/or period a product was
sold.
687 Date ready for collection
A date on which an object is ready for collection.
688 Shipping date, no schedule established as of
As at this date no valid shipping schedule has been
established.
689 Shipping date and/or time, current schedule
Shipping date and/or time as currently scheduled.
690 Suppliers' average credit period
The average period of time that credit is extended by
suppliers.
691 Advising date
Date of advice.
692 Project over target baseline date
The date an over target baseline was implemented for a
project.
693 Established date
Date when an entity was established or created.
694 Latest filing period
Latest period for which a filing may be made.
695 Mailing date
Date when an item may be mailed.
696 Date/time of latest accounts filing at public registry
The latest date/time when financial accounts were filed
at public registry.
697 Date placed in disfavour
Date when placed in a disfavoured category or status.
698 Employment position start date, estimated
Estimated start date of employment in a particular
position.
699 Registered contractor number assignment date, original
Date when a registered contractor number was originally
assigned.
700 Ownership change date
Date when ownership changes.
701 Original duration
Original length of time.
702 Period between changes
The period of time between changes.
703 From date of notice to proceed to commencement of
performance
Period of time from notice to proceed until performance
commencement.
704 From date of notice to proceed to completion
Period of time from date of notice to proceed until
completion.
705 Period an event is late due to customer
The period of time an event is late due to the actions
of a customer.
706 File generation date and/or time
Date and, or time of file generation.
707 Endorsed certificate issue date
Date on which a certificate, endorsed by signature or
other agreed means, is issued.
708 Patient first visit for condition
The date of the first visit by a patient to a healthcare
provider for this condition.
709 Admission date and/or time, expected
Expected date and/or time of admission.
710 Symptoms onset, patient alleged
Date and/or time of onset of symptoms according to the
patient.
711 Accident benefit period
To identify the period of time for which benefits are
provided in the event of an accident.
712 Accident benefit age limit
To identify the age to which benefits are provided to
the insured in the event of an accident.
713 Accident lifetime benefit qualification age
To identify the qualification age for lifetime benefits
provided to the insured in the event of an accident.
714 Sickness benefit period
To identify the period of time for which benefits are
provided in the event of sickness.
715 Sickness benefit age limit
To identify the age to which benefits are provided to
the insured in the event of sickness.
716 Sickness lifetime benefit qualification age
To identify the qualification age for lifetime benefits
provided to the insured in the event of sickness.
717 Accident insurance elimination period
To identify the period of time the insured must be
disabled in the event of an accident for benefits to be
payable by the ceding company.
718 Sickness insurance elimination period
The period of time the insured must be disabled in the
event of sickness for benefits to be payable by the
ceding company.
719 Provider signature date
Date when the provider signed.
720 Condition initial treatment date
Date when initially treated for this condition.
721 Information release authorization date
Date when the information was authorized to be released.
722 Benefit release authorization date
Date when a benefit is authorized for release.
723 Last seen date
The date when last seen.
724 Acute manifestation date
The date the symptoms manifested themselves in an acute
form.
725 Similar illness onset date
The date of the onset of an illness similar to the
illness currently being treated.
726 Last X-ray date
The date the last X-ray was taken.
727 Placement date, previous
The date something was previously placed.
728 Placement date
The date something is placed.
729 Temporary prosthesis date
The date a temporary prosthetic device was provided.
730 Orthodontic treatment period, remaining
The period of time that the orthodontic treatment has
remaining.
731 Orthodontic treatment period, total
The period of orthodontic treatment from beginning to
end.
732 Maximum credit granted date
Date on which the highest credit was granted.
733 Last date of accounts filed at public register
Date on which accounts were last filed at the public
register.
734 Allowed renewal duration period
The period of time a company can renew its duration
period.
735 Offset from Coordinated Universal Time (UTC)
Number of hour's offset from Coordinated Universal Time
(UTC).
736 Appointment expiry date
Date when an appointment will expire.
737 Earliest filing period
Earliest period for which a filing is made.
738 Original name change date
Date when the original name was changed.
739 Education start date
Date education begins at an educational institution.
740 Education end date
Date education is completed at an educational
institution.
741 Receivership period
Period of time a receivership lasts.
742 Financial information submission date/time
Date/time when financial information is submitted.
743 Purchase order latest possible change date
Date identifying a point of time after which a purchase
order cannot be changed.
744 Investment number allocation date
The date that an investment number was allocated.
745 Payment impossible
Date/time when a payment is recorded as being
impossible.
746 Record extraction period
The period for extraction of records.
747 Cost accounting value date
Code identifying the value date of cost accounting.
Value date is the date at which the entry is to effect a
balance of the account.
748 Open period
Code identifying the period during which something is,
was or will be open.
749 Period between issue date and maturity date
Interval of time between the date when the transaction
was initiated and the date when the funds need to be
collected.
750 Before date
The specified before date.
751 After date
The specified after date.
752 Meter reading date, next scheduled
Date on which the next reading of a meter is scheduled
to take place.
753 Maturity date, optimal
Date at which optimal maturity occurs.
754 Product ageing duration, maximum
Maximum period of time during which the product is
ageing.
755 Product ageing duration, minimum
Minimum period of time during which the product is
ageing.
756 Ultimate documentation date/time for 24-hour rule
regulation of CBP (United States Customs and Border
Protection)
Ultimate date/time by which the documentation must be
submitted in compliance with the 4-hour rule of United
States Custom of Border Protection.
757 Departure date/time from place of loading
Date/time of the departure of the goods from the place
of loading.
758 Trade item ship date/time, earliest possible
The earliest date/time that the trade item can be
shipped.
759 Trade item ship date/time, latest possible
The latest date/time that the trade item can be shipped.
760 Start date/time, maximum buying quantity
The date/time from which the maximum buying quantity may
be purchased.
761 Start date/time, minimum buying quantity
The date/time from which the minimum buying quantity may
be purchased.
762 Marketing campaign end date/time, suggested
The date and or time suggested for the marketing
campaign to end.
763 Marketing campaign start date/time, suggested
The date and or time suggested for the marketing
campaign to start.
764 Start availability date
The start date of availability.
765 Seasonal availabilty calendar year
The calendar year of the season in which the trade item
is available.
766 Goods pickup lead time
Minimum time required between order entry and goods
release for pick-up.
767 Change date/time, latest
Most recent date and/or time that the information has
been changed.
768 End date/time, maximum buying quantity
The date and/or time until which the maximum buying
quantity may be purchased.
769 End dat/time, minimum buying quantity
The date and/or time until which the minimum buying
quantity may be purchased.
770 End date/time of exclusivity
The date and/or time until which a product is exclusive.
771 Data release date
The date at which the data is released.
772 Handling start date and/or time, actual
The actual date and/or time when the start of the
handling action takes place.
773 Handling end date and/or time, estimated
The date and/or time when the end of the handling action
is estimated to take place.
774 Handling end date and/or time, actual
The actual date and/or time when the end of the handling
action takes place.
775 Minimum product lifespan for consumer
The minimum life span of the product remaining after
selling it to the consumer, i.e. between the "sell by
date" and the "use by date" of the product.
776 Entry date, elected
Date used at the discretion of the filer for duty
calculation of non-quota goods when there is no
immediate transport entry date (related to immediate
delivery).
777 Arrival date/time at initial port with the intent to unload
Date/ time that the conveyance arrives at the initial
port in the country of destination.
778 Conveyance port activity date/ time
The date and time of conveyance activity, including
cargo loading or unloading, fuelling etc.
779 Date and time of importation into port limits
Date and time on which the conveyance transporting the
goods from the foreign country arrived within the limits
of the port of destination.
780 Free trade zone commodity status assignment date
The filing date that corresponds to the current status
of the commodity in the free trade zone.
781 Jurisdiction entry date/time, actual
Actual date/time at which the conveyance or goods enter
an agency's jurisdiction.
782 Inspection start date/time
Date/time at which an inspection begins.
783 Inspection end date/time
Date/time at which an inspection is completed.
784 Document/message rejection date/time
Date/time at which the document/message was rejected.
785 Government service date/time, requested
The date/time at which the government service is
requested to be executed.
786 Crop year
The year that the crops were grown.
787 Date of original manufacture
Date that the item was originally manufactured.
788 Model year
The model year of the item.
789 Opened trade item life span
The number of days the trade item that has been opened
can remain on the shelf before it must be removed.
790 Unmooring, date and time
Date and time of unmooring.
791 First crane lift
Date and time of the first crane lift.
792 Last crane lift
Date and time of the last crane lift.
793 Reprocessing date/time
Date/time on which goods previously produced are re-
processed.
794 First returnable date/time
The first date/time on or after which items can be
returned.
795 Community visibility date/time
The date/time from which information becomes visible to
the target community.
ZZZ Mutually defined
A code assigned within a code list to be used on an
interim basis and as defined among trading partners
until a precise code can be assigned to the code list.
Data Element Cross Reference
DataElement 2005 is used in the following Batch Composite Elements:
C507
DataElement 2005 is used in the following Interactive Composite Elements:
E013 E507
Copyright United Nations, all rights reserved
UN Economic Commission for Europe
Palais des Nations, CH-1211 Geneva 10, Switzerland
Tel: +41-22 917 2773 Fax: +41-22 917 0037 E-mail: [email protected]
UN/EDIFACT Directories