E291: Enhancing transboundary cooperation and governance in the Drin river basin

EXCOM Form:

 

EXCOM form

Concept Paper or Project Document:

 

Concept paper

Annual Progress Reports:

 

 

Final Report:

 

 

Key project deliverables:

 

 

Links to project page:

 

 

Evaluation:

 

https://unece.org/evaluation-reports
 
Part I. Planning
(to be filled in before submission to EXCOM)
Part II. Implementation
(to be used for reporting on progress in the implementation of the project in real time)1,2

Expected accomplishments

Planned activities

Estimated costs (US$)

 

Implemented activities3

Actual expenditures4 (US$)3

EA 1: Improved understanding on key transboundary concerns and Integrated Water Resource Management among countries in the extended Drin River Basin 


 
A1.1 Preparation of thematic report on legal and institutional analysis and contribution to the chapter on legal and institutional analysis of Transboundary Diagnostic Analysis
 
$15,000

1.

2.

...

 
A1.2 Preparation of thematic report on Water-Food-Energy nexus and chapter on Water-Food-Energy nexus
 
$60,000

1.

...

 
A1.3 Provision of technical and policy advice to the draft Strategic Action Plan
 
$7,500

1.

...

 
A1.4 Contribution to the development of Lake Ohrid Management Plan
 
$42,300

1.

...

 
EA 2: Strengthened monitoring and information exchange in the Drin River basin   A2.1 Support to the work of the Expert Working Group (EWG) on Monitoring and Information Exchange, including support to the servicing of 6 meetings of the EWG
 
$32,200

1.

 
A2.2 Organization of two capacity building workshops on various aspects of transboundary cooperation
 
$44,600

1.

 
Total direct cost: $201,600 Total direct cost:  
7% of Programme Support Costs $14,100 7% of Programme Support Costs  
Total budget: $215,700 Total budget:  
Footnote


1 The secretariat shall inform EXCOM in case of unexpected developments or serious problems of any kind in the project implementation.
2 Questions from member States on project implementation will be forwarded to the secretariat.
Relevant information should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity and include the following:
(a) For an advisory service (including at a workshop/seminar/training organized by other organizations): title; venue; dates; project expenditures; and hyperlink(s) to presentation(s) and other relevant documents;
(b) For a workshop/conference/training organized by UNECE: title; venue; dates; project expenditures; and hyperlinks to the meeting agenda, list of participants, presentation(s) made by UNECE, conference documents, training materials and reports;
(c) For a consultancy: project expenditures; hyperlinks to the consultancy ToR and main outputs (study, report, training material, presentation, etc.) produced by the consultant/s;
(d) For other outputs not included under bullet points above: hyperlink to relevant documents.  
[1] Relevant financial information – certified by the Executive Office - should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity.

 