EXCOM Form:
|
EXCOM form |
|
Concept Paper or Project Document:
|
Concept paper |
|
Annual Progress Reports:
|
|
|
Final Report:
|
|
|
Key project deliverables:
|
|
|
Links to project page:
|
|
|
Evaluation:
|
https://unece.org/evaluation-reports |
| Part I. Planning (to be filled in before submission to EXCOM) |
Part II. Implementation (to be used for reporting on progress in the implementation of the project in real time)1,2 |
|||
|
Expected accomplishments |
Planned activities |
Estimated costs (US$)
|
Implemented activities3 |
Actual expenditures4 (US$)3 |
|---|---|---|---|---|
| EA 1: Improved understanding on key transboundary concerns and Integrated Water Resource Management among countries in the extended Drin River Basin |
A1.1 Preparation of thematic report on legal and institutional analysis and contribution to the chapter on legal and institutional analysis of Transboundary Diagnostic Analysis |
$15,000 |
1. 2. ... |
|
| A1.2 Preparation of thematic report on Water-Food-Energy nexus and chapter on Water-Food-Energy nexus |
$60,000 |
1. ... |
||
| A1.3 Provision of technical and policy advice to the draft Strategic Action Plan |
$7,500 |
1. ... |
||
| A1.4 Contribution to the development of Lake Ohrid Management Plan |
$42,300 |
1. ... |
||
| EA 2: Strengthened monitoring and information exchange in the Drin River basin | A2.1 Support to the work of the Expert Working Group (EWG) on Monitoring and Information Exchange, including support to the servicing of 6 meetings of the EWG |
$32,200 |
1. … |
|
| A2.2 Organization of two capacity building workshops on various aspects of transboundary cooperation |
$44,600 |
1. … |
||
| Total direct cost: | $201,600 | Total direct cost: | ||
| 7% of Programme Support Costs | $14,100 | 7% of Programme Support Costs | ||
| Total budget: | $215,700 | Total budget: | ||
Footnote
1 The secretariat shall inform EXCOM in case of unexpected developments or serious problems of any kind in the project implementation.
2 Questions from member States on project implementation will be forwarded to the secretariat.
3 Relevant information should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity and include the following:
(a) For an advisory service (including at a workshop/seminar/training organized by other organizations): title; venue; dates; project expenditures; and hyperlink(s) to presentation(s) and other relevant documents;
(b) For a workshop/conference/training organized by UNECE: title; venue; dates; project expenditures; and hyperlinks to the meeting agenda, list of participants, presentation(s) made by UNECE, conference documents, training materials and reports;
(c) For a consultancy: project expenditures; hyperlinks to the consultancy ToR and main outputs (study, report, training material, presentation, etc.) produced by the consultant/s;
(d) For other outputs not included under bullet points above: hyperlink to relevant documents.
[1] Relevant financial information – certified by the Executive Office - should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity.
Go back to the list of projects for Environment
Go back to the main list of projects