E190: Capacity-building for cooperation on dam safety in Central Asia, phase 3

 

EXCOM approval

Planning phase

Implementation phase

Final Reporting
and Evaluation phase

EXCOM form

  • More information including full meeting reports and final project phase reports and evaluation available
    on the following site.
  • Only restricted funding available as
    of 31 December 2014.
Monitoring the Implementation

Final/Terminal report

• Evaluation ToR
• Evaluation report
Implementation

 

 
Midpoint/Annual Progress Reports Annual funds utilization reports
Annual funds utilization report
 
Part I. Planning
(to be filled in before submission to EXCOM)
Part II. Implementation
(to be used for reporting on progress in the implementation of the project in real time)1,2

Expected accomplishments

Planned activities

Estimated costs (US$)

 

Implemented activities3

Actual expenditures4 (US$)3

EA 1: Improved national legislation and strengthened institutions responsible for the safety of hydrotechnical installations

A1.1 Preparation of a consultant report with proposals on legal acts, regulations and institutional set-up in Turkmenistan

     

A1.2 Organization of a national workshop and a roundtable in Turkmenistan

  Roundtable on Dam Safety (Astana, Kazakhstan, 17 September 2014)  

EA 2: Improved capacity of national experts and officials on the safety of hydrotechnical installations

A2.1 Organization of a regional training courses for experts and officials from all five countries

 

1. 1st training seminar on safety of hydraulic structures (Taraz, Kazakhstan, 14-18 April 2014)

2. 2nd training seminar on safety of hydraulic structures (Taraz, Kazakhstan, 26-30 May 2014)

3. Training on Dam Safety (Shymkent, Kazakhstan, 19-21 November 2014)

 

A2.2 Development of training materials, documents, guidelines and their dissemination 

 

1. EDB Dam Safety project proposal in ENG
2. UNECE-EDB Dam Safety Contribution Agreement in ENG
3. DAM Safety EADB project final report in RUS
Annex A in RUS
Annex B in RUS
Annex C in RUS

 

EA 3: Improved regional cooperation on the safety of hydrotechnical structures

A3.1 Development of a work programme for the working group

 

1. MoU for grant no ECE/GC/2013/029 between UNECE and EB IFAS

2. Report of the Regional Meeting on Dam Safety Cooperation in Central Asia (Almaty, Kazakhstan, 19-20 November 2013) in ENG and RUS

3. Regional Meeting on Dam Safety Cooperation in Central Asia (Bishkek, Kyrgyzstan, 11-12 November 2014)

 

EA 4: Increased safety of individual dams and development of confidence for active cooperation on such dams between neighbouring countries in transboundary river basins

A4.1 Ongoing experience exchange among all areas/cases

     

A4.2 Support to selected priority DS measures for dam 3

     

EA 5: Evaluation and good communication of project results

 

A5.1 Internal evaluation of the project

     

A5.2 Organization of a final project conference

     

A5.3 Drafting and printing of project publication

     

A5.4 Updating project webpage

     
Total:      
Footnote


1 The secretariat shall inform EXCOM in case of unexpected developments or serious problems of any kind in the project implementation.
2 Questions from member States on project implementation will be forwarded to the secretariat.
Relevant information should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity and include the following:
(a) For an advisory service (including at a workshop/seminar/training organized by other organizations): title; venue; dates; project expenditures; and hyperlink(s) to presentation(s) and other relevant documents;
(b) For a workshop/conference/training organized by UNECE: title; venue; dates; project expenditures; and hyperlinks to the meeting agenda, list of participants, presentation(s) made by UNECE, conference documents, training materials and reports;
(c) For a consultancy: project expenditures; hyperlinks to the consultancy ToR and main outputs (study, report, training material, presentation, etc.) produced by the consultant/s;
(d) For other outputs not included under bullet points above: hyperlink to relevant documents.  
[1] Relevant financial information – certified by the Executive Office - should be uploaded by the project manager on the Project Monitoring Tool within one month from the end of the activity.