Skip to main content

Publications

Displaying Results 21 - 26 of 26

- English
TEM Project Strategic Plan 2017 – 2021 is a roadmap for the implementation of the TEM Project for 2017 – 2021.The Strategic Plan 2017 – 2021 value proposition:The TEM Project aims to support UNECE and the Inland Transport Committee in pursuing the Sustainable Development Goals related to road infrastructure management;TEM Project will interpret and translate the Sustainable Development Goals
- English
Phase 1 of the Highspeed Masterplan for the TER region has now been completed. The study is available here and covers the following areas:- An introduction to, and history of, High Speed Railways- A review of the benefit, political background, best practice and status of high-speed- Review of related work,
- English
The TEM and TER revised Master Plan Final report consists of two Volumes - Volume l, containing the main text and Volume II – Annexes.Volume I: Main textVolume II: AnnexesVolume I, is being
- English
Integrated Report on Comparison of the TEM and TER Master Plan Backbone Networks and on Implementation of the Priority projects in 2006 Report (pdf 42 KB) Attachment A (pdf 3,970 KB)
- English
In September 2005, the TEM and TER Projects completed the elaboration of their Master Plan, including the identification of the backbone networks for road and rail transport in 21 Central, Eastern and South-Eastern European countries as well as a realistic investment strategy to gradually develop these networks. As a result of this exercise, as many as 491 projects (319 TEM and 172 TER)
- English
The UNECE-sponsored Trans-European North-South Motorway (TEM) Project has published the 3rd Edition of its Standards and Recommended Practice to reflect the up-to-date requirements of motorway users, the latest experience, research and development achievements in the field of motorway design, construction and operation as well as newly required safety measures in motorway tunnels.These